HomeMy WebLinkAbout12142022 City Council Packet(1)__________________________________________________________________________________________________________________________________________________________________________________________________________________________
City Council Special Meeting Agenda
Public Forum Regarding Proposed Sales Tax
City Council Chambers at City Hall
55 W. Tompkins Street
Wednesday, December 14, 2022
6:00 p.m.
Mayor Schwartzman is calling a special meeting of the Galesburg City Council for the limited purpose of receiving
public comment and/or providing information concerning the proposed ordinance to increase the Home Rules
Sales Tax rate from 1.00% to 1.25%. This ordinance was included on the December 5, 2022 City Council agenda
for a first reading and is included on the December 19, 2022 City Council agenda for final reading.
There are no action items on the agenda. Community members are invited to provide comments or questions in-
person or via GoogleMeet. The public forum will also be streamed live on Comcast channel 7 and the city’s website.
6:00 p.m. Public Comment limited purpose of receiving public comment and/or providing information
concerning the proposed ordinance to increase the Home Rules Sales Tax
rate from 1.00% to 1.25%.
To Join the Meeting via GoogleMeet, please follow the instructions below
Wednesday, December 14 · 6:00 – 8:30pm
Google Meet joining info
Video call link: https://meet.google.com/jfv-dtyg-zsy
Or dial: (US) +1 205-844-5189 PIN: 102 849 475#
More phone numbers: https://tel.meet/jfv-dtyg-zsy?pin=8135626092367
It is estimated to cost $7.3 million to
convert the former Churchill Junior High
into a community center, as depicted in
the diagram. The breakdown of what is
included in that cost estimate is below.
Renovation $2,050,000
Renovation allowance $650,000
Minor Parking
Improvements $200,000
Building Code Required
Updates (Incl. re-roofing) $3,000,000
Demolition $600,000
Architectural/Engineering $552,500
Fixtures, Furnishing, and
Equipment $300,000
Total $7,352,500
Please provide feedback on the proposed
sales tax being considered and/or the
Churchill community center project, in
the space provided below, or email the
Mayor and City Council with comments at
council@ci.galesburg.il.us.
____________________________________________________________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
EXECUTIVE SUMMARY COMMUNITY CENTER AND CAPITAL INFRASTRUCTURE PROGRAM
DECEMBER 13, 2022
1
Contents
Mayor’s Letter of Transmittal: ................................................................................................................... 2 Executive Summary ..................................................................................................................................... 4 History .......................................................................................................................................................... 4 2021 and After ............................................................................................................................................. 4 Funding Options .......................................................................................................................................... 7 Appendix A ................................................................................................................................................. 13 Bibliography (footnotes) .......................................................................................................................... 15
2
Mayor’s Letter of Transmittal:
In the past year, the City Council has committed millions of dollars to some very important endeavors. We
provided $775,000 so the new library will have improved technology. We promised approximately $4
million (and provided $2.2 million to date) for the renovation of the Hawthorne Pool. We made a $1
million promissory gift to the Railroad Hall of Fame project. To support business development, we
provided $750,000 to fund grants for new business creation (female/minority-owned, southside, and
agriculturally-focused) to be spread out over the next three years. To address safety concerns, we added
two police officer and two community service officer positions. And next year’s budget increases
firefighters by three. These, and other smaller allotments of City dollars, demonstrate the commitment
that the City Council is making for Galesburg’s prosperous future. Yet more needs to be done to address
two other critical needs in our community: roads & community quality of life.
Distinguished professor Robert Bellah defined a "community" as “a group of people who are socially
interdependent, who participate together in discussion and decision making, and who share certain
practices that both define the community and are nurtured by it.” How does one achieve this? Maximizing
opportunities for interaction, exchange, and growth plays a major role. A community center is a place
which exists primarily to further these ideals. Yes, there are other "centers" in a community that
are important, such as schools, churches, senior centers, etc., but notice that each of these have inherent
limitations to them (as in, not everyone shares the same religion or goes to the same church or school,
and not everyone is a senior). Even a library has barriers because of it being historically associated as
solely a place to find books, magazines and computers (something many people don't connect with or can
obtain for themselves through individual purchases) and "quiet". A community center intentionally breaks
down those barriers and invites everyone to come and be part of something important, meaningful and
bigger than they can be on their own.
Galesburg has lost two community centers in the past nine years, the one it operated and sold and the
Boys and Girls Club that burned down. Over this time, there have been other losses in our community that
have reduced options for people (especially youth) to convene and socialize (namely, the closure of the
skating rink, the bowling alley, Carl Sandburg Mall, etc.). And on top of that, the significant impact the
pandemic has had on reducing opportunities for healthy socialization among people of all ages, and
especially youth, is well-documented.
For all these reasons, Galesburg will greatly benefit from the development of a new community center.
But rather than recreating the one it had, which provided only very limited services, including having
nothing for children/youth to do, it should strive to have one that fills the gaps that exist in current
offerings and acts as a feeder to other community assets that could benefit from greater engagement.
What gaps exist? Children don't have inexpensive places to learn trades (carpentry, cooking, home repair,
etc.), attain new skills (second language, music, gardening, genealogy, etc., play e-sports, pool or ping
pong, participate in tutoring exchanges, connect with community volunteer efforts, or just "hang out" and
be social in a safe space. In fact, much of the same could be said for people of all ages! Importantly, it can
serve as an additional location for job-training and employment recruitment for adults.
A community center is a perfect place to attract people to any number of its various
activities/opportunities and, then, given the proximity of other unfamiliar activities, serve as a positive
introduction to something new. At a community center, local organizations and non-profits can bring their
"wares” for hand-on show and tells, and thereby introduce their mission while recruiting people to attend
their events and establishments.
3
A community center also serves as a centralized hub for things people in the community need, be they
something as simple as directions or phone numbers to relevant agencies, or something material (such
as, toothpaste, diapers, cough drops, or baby formula). Visitors to the center may need positive social
interaction or advice on how to get mental health care, assistance from service agencies, or employment.
In this way, a community center is a location for "one stop 'shopping'", a welcome feature when so often,
currently, people need to travel to a dozen places to get all of what they need. A community center can
have regular, dependable hours, which increases community trust and fosters an appreciation of the value
of government and the services they can provide effectively.
A community center is also a foundational element in building community pride and community identity.
When people work together on projects, they develop a strong connection to place and a deep sense of
accomplishment and purpose. Working with other people in the community, that they may have never
met before, solidifies people's sense of belonging and value.
The former Churchill Junior High building has all the space one needs to carry out the above activities, as
established by our consultant studies. It also has a multi-purpose gymnasium, a well-equipped kitchen
(and eating area), a large auditorium, and a huge amount of grassy acreage. Given the age of the building,
there will be significant updates and improvements made but these have been evaluated and costs
estimated for these modifications.
The Community Center will be a huge attractor for positive interaction and learning. People of all ages
and backgrounds will be able to connect and share stories and wisdom. People will come to appreciate
their neighbors and City employees and from that will spawn unimaginable acts of goodwill. Galesburg
has suffered from the loss of its two community centers and a host of other setbacks to our social fabric.
Now is the time to demonstrate our City's resilience, heart and unquenchable spirit. Now is the time to
inject optimism into our future and build something that will serve so many with so much.
Beyond needing a community center, it has become readily apparent that our city roads are inadequate.
We have long known this and have been injecting monies to this challenge, but the feedback we recently
received from our Community Survey really brought the message home. Additional information from our
Public Works department about future needs for road maintenance has only reinforced this from an
economic perspective. So we are eager to embark on a capital infrastructure improvement program that
can make significant improvements to our roads in the near term.
Thus, to secure reliable funds to support these two initiatives (a community center and public
infrastructure), I support the issuance of a 0.25% increment to our home-rule sales tax. The $950,000 that
will be generated from this tax annually will provide us the necessary funds to move forward with these
two important, necessary, and lasting improvements to our community. Finally, for those that were
unaware of this journey and activity at the City Council over these past few years, please pay close
attention to the footnotes that represent more than 2,300 pages of reports, documents, City Council
actions, and presentations with references and actions demonstrating the commitment by the majority
of the City Council in support of this great need.
This Executive Summary has been prepared to fully inform the public of that journey and the rationale for
the decision to proceed forward to bring back a Community Center, one which will serve and invest in
present and future generations in a multiplicity of ways, and to begin the process of reinvesting in the
City’s capital Infrastructure needs as well.
Peter Schwartzman, Mayor
4
Executive Summary
History
The City of Galesburg has had several areas designated as community centers throughout the city over
the course of the last 30+ years. The first was a city-run facility, known as the Galesburg Community
Center, located at a 150 E. Simmons Street (current location of Iron Spike Brewery), which had previously
served as the City’s fire station up until 1975. The Galesburg Community Center opened in 1977 and was
owned and operated by City of Galesburg and housed the Recreation Division, Handivan, and VNA
Services. The City of Galesburg Recreation Division held programs at the former Community Center and
rented the facility for small functions. Once Recreation moved out of the building, the Handivan and VNA
continued to have offices and programs. The VNA offered meals for seniors and the building was also
reserved for small gatherings. This community center operated until 2013 when it was eventually sold for
commercial use and approved by an affirmative vote by the City Council on June 3, 2013(1)(2).
The other community center was located at 424 Depot Street and known as the Carver Center. The Carver
Center opened in 1944 when it served as a USO center for returning troops, particularly African-American
soldiers. It later became the home of the Boys and Girls Club. Because its origins and its location in poorer,
more ethnically diverse neighborhood, it became a facility that served youth from predominantly poorer
and non-white parts of the Galesburg community with a place to recreate athletically and socially as well
as learn skills in its computer room and kitchen. It also served as a community gathering space for a wide
array of activities.
In the Spring of 2015, the City struggled to resolve an agreement that would provide for the ongoing
financial support for the Boys and Girls Club to continue in its youth-oriented programming at the Carver
Community Center.3 Several months later, the City Council approved an Agreement with Boys & Girls Club
at the Carver Center that included a number of improvements to the building.4 But on September 6, 2016,
the Boys and Girls Club ceased operation of the Carver Community Center as a result of a fire. From that
date forward, the City of Galesburg contemplated the creation of a community center at its Armory facility
(on south Broad Street) but ultimately decided to move to other priorities until 2021’s municipal election
and the seating of four new Councilors and a new Mayor. 2021 and After
Five years after the Carver Community Center fire, the City Council presided over a Council budget Work
Session and a lengthy discussion took place over a memo that outlined estimated operating expenses and
1 May 20, 2013 – Ordinance on 1st Reading to sell Community Center 150 E Simmons St. to Mark Kleine for Iron Spike for $115,000. Residents
spoke in opposition to the sale. Link to minutes with relevant sections highlighted.
2 June 3, 2013 – Ordinance on Final Reading to sell Community Center. Residents spoke out against the sale at the meeting or to have a suitable
alternative available. Item 13-1022 was approved, 6 yes, 1 absent. Link to minutes with relevant sections highlighted.
3 April 6, 2015 – Agreement for community center services to be provided by the Boys and Girls Club at the Carver Center. Item 15-4033 was
tabled and amended several times, ultimately failing, replaced with item 15-4066 below.
4 June 15, 2015 – Agreement with Boys & Girls Club at the Carver Center for building improvements. Item 15-4066 was approved, 6 yes, 1 absent.
5
the possible use of a new community center.5 As a result of that discussion, the City engaged the services
of the Farnsworth Architectural/Engineering firm to provide a code study of the former Churchill Junior
High building and determine estimates of costs for bringing the building into compliance with all building
codes.6 While a number of buildings were identified as candidates for a potential community center, the
City decided to tour the decommissioned Churchill junior high school.7 By March of 2022, a majority of
the City Council voted to approve the direction of City Staff to acquire the Churchill property.8 The ensuing
Council meetings saw the first reading of the proposed purchase of the Churchill property 9, in addition to
a failed motion to place an advisory question on the ballot in referendum form, “Should the City of
Galesburg spend between $5 million and $10 million to convert the former Churchill Middle School into a
community/activity center?”10. This measure failed on a three to four vote. By the end of April 2022, Ald.
White and Ald. Smith-Esters held an open house for Churchill for the public to walk through the building
and provide comments. Members of the Youth Commission participated and helped give tours, and
approximately 45 citizens, plus a few school staff attended.11
At the next scheduled City Council meeting, the Ordinance on final reading for an Intergovernmental
Agreement with Galesburg Community School District No. 205 to purchase the Churchill property was
approved with four affirmative votes,12 and a decision was later made to authorize Farnsworth to
investigate alternative locations and options for the Community Center to evaluate if it would be better
to renovate or build a new facility 13. Soon afterwards, the Council and some administrative staff attended
a field-trip work session to tour the Rock Island Fitness and Activity Center and the Rock Island Martin
Luther King Jr. Community Center. In the month of September 2022, the City Council reviewed proposed
community center options with Farnsworth Group.14
5 November 2, 2021 – City Council Work Session to review the proposed budget. As part of that meeting a memo was provided and discussed by
the Council at the work session. The memo estimated operating expenses and possible uses in the building.
6 November 15, 2021 – Council hired Farnsworth to provide a code study of the building and determine estimates of costs for bringing the building
into compliance with all building codes. Item 21-4108 was approved, 5 Yes, 2 Abstain
7 November 29, 2021 – City Council toured the Churchill building to get a general sense of its layout, space, and condition. This was a Galesburg
City Council meeting and was therefore publicly noticed and open to the public.
8 March 21, 2022 – Request for direction from Council on acquiring the Churchill property. Item 22-4032 was approved, 4 Yes 3 No.
9 April 18, 2022 – Ordinance on first reading for IGA to purchase Churchill property, Item 22-1013.
10 April 18, 2022 – Resolution placing an advisory question on the ballot “Should the City of Galesburg spend between $5 million and $10
million to convert the former Churchill Middle School into a community/activity center?” Item 22-2023 failed, 3 Yes 4 No.
11 April 28, 2022 – Ald. White and Ald. Smith-Esters held open house for Churchill for the public to walk through the building and provide
comments. Members of the Youth Commission participated and helped give tours, approximately 45 citizens, plus a few school staff attended.
12 May 2, 2022 – Ordinance on final reading for IGA to purchase Churchill property. Item 22-1013 was approved, 4 Yes, 3 No.
13June 20, 2022 – City Council approved agreement with Farnsworth for evaluation of alternative locations and options for the Community Center
to evaluate if it would be better to renovate or build new. Item 22-4049 was approved, 4 Yes, 1 No, 1 Abstain, 1 Absent.
14 September 26, 2022 – City Council work session to review proposed community center options with Farnsworth Group who provided a
presentation on potential locations. Please note – estimates were updated after this presentation.
6
The City of Galesburg also launched a citizen
satisfaction survey in July 2022, in order to gain
citizen feedback and priorities. The results of this
survey were presented to the City Council at the
October 23, 2022 council work session. The survey
included an inquiry if the City should build or
renovate a building for the purposes of a
community/activity center, which 62% of
respondents answered “yes” (and 21% said “no”).
At the November 14, 2022 City Council Work Session, City staff provided an overview of the City’s
finances 15 and discussed selecting a location for the Community Center. A straw poll was taken of the
Council and four voted in favor of the Churchill location and staff was directed to move forward with that
option. At the November 21, 2022 meeting, a City Council motion to hold a Community Center Public
Hearing to gather public input on the location for the proposed community center failed.16
At the December 5, 2022 City Council meeting, City Council voted in favor of approving the former
Churchill building as the location for the community center.17 A total of five locations were reviewed, and
price estimates for each proposed site are included in the chart below. The cost estimates reflected in the
15 November 14, 2022 – City Council work session provided overview of the City’s finances and discussed selecting a location for the
Community Center. A straw poll was taken of the Council and 4 voted in favor of the Churchill location and staff was directed to move forward
with that option.
16 November 21, 2022 – City Council considered a resolution to hold a Community Center Public Hearing to gather public input on the location
for the proposed community center. Item 22-2070 failed, 3 Yes, 3 No.
17 December 5, 2022 – City Council considered selecting Churchill as the community center location. Item 22-4115 was approved, 4 yes, 3 no.
7
chart below were updated since the original estimates provided in the presentation by Farnsworth, as
Farnsworth had underestimated the cost to comply with codes and did not include
architectural/engineering (A/E) services or fixtures, furnishing, and equipment (FFE) costs.
Location Type of Construction Total Estimated Costs
Gunther New Construction $9,755,775
820 E. Fifth New construction $9,386,875
Churchill Renovation $7,352,500
Hawthorne New construction for Comm Ctr, renovation of Gym $6,755,750
Library Renovation $5,627,350
The $7.3 million estimated cost for Churchill is the most up to date estimate, and the breakdown of what
is included is detailed below.
Renovation $2,050,000
Renovation allowance $650,000
Minor Parking Improvements $200,000
Building Code Required Updates (Incl. re-roofing) $3,000,000
Demolition $600,000
Architectural/Engineering $552,500
Fixtures, Furnishing, and Equipment $300,000
Total $7,352,500
A memo was also subsequently provided by staff summarizing the environmental conditions in the
building.18 The report indicates that there does not appear to be issues radon gas, and there is no presence
of toxic black mold, or vermin/insects. The report elaborates that there is some mold in the building but
does not appear to be a major issue. Asbestos was identified in the building based on testing from 2017
and $60,000 has been included in the budget for the needed hazard abatement. Lead paint testing has
not been conducted, but if lead paint is found, an abatement plan will be developed by the architect for
the project. Funding Options
Upon the arrival of the new City Manager, and his review of the financial report provided by the City’s
financial Advisor (Speer Financial), he recommended that if the City were to move forward with the
construction of a community center, that it be also combined with a strategy to address the City’s aging
infrastructure as acknowledged by the survey respondents that rated the repair to streets and roads as
their highest priority. The City Manager, with the assistance of the Speer financial, looked at a number of
scenarios that included the ability to leverage debt that could significantly result in a large-scale
infrastructure improvement strategy, in addition to supporting the construction of a community center.
The City of Galesburg allocates funding for streets and sidewalks through the City's General Fund, Local
City Gas tax, and the City's share of the State Motor Fuel Tax. In addition, the Federal Highway
Administration (FHWA) provides a funding allotment to the Galesburg urbanized area that is held and
18 Environmental conditions memo.
8
programmed by IDOT on the urbanized area's behalf. The urbanized area includes Galesburg, East
Galesburg, and Knoxville. The three communities split the allotment based on population. The federal
funds are held by the State and the City programs capital projects through the State, the City does not
receive this funding at the City. The allotment varies from year to year but is estimated to be $611,000 in
2023.
In the approved 2023 Budget, the City's General Fund will provide $2,443,605 towards engineering
services and street maintenance operations. Personnel expenses comprise 63.1% of this amount,
Electricity of city owned street lights, traffic signals and the two street division buildings comprise 9.4% of
this amount. The balance of the general fund for engineering services and street maintenance goes to
vehicle and building maintenance. No General Fund dollars are available for capital projects.
The City Gas Tax Fund is a specifically designated fund for the purpose of capital improvements, including
street construction and rehabilitation, curb and gutter work, storm sewer, sidewalk and other street-
related improvements. By a majority vote of the corporate authorities, the City Gas Tax Fund may be
pledged by the city as security for the repayment of monies borrowed by the city to be used for capital
improvements as defined in this section. The current tax rate is $0.045 per gallon and generates an
estimated $680,000 per year of which $497,000 goes towards operation and maintenance items and
leaves only $183,000 available for capital projects.
The State Motor Fuel Tax is a tax the State imposes for the privilege of operating motor vehicles on public
highways and recreational watercraft on waterways in Illinois. It is paid by distributors and suppliers who
collect the tax from their customers. The City receives monthly distributions of the State Motor Fuel Tax
which is distributed based on the City’s population. The current tax rate is $0.392 per gallon for gas and
$0.467 per gallon for diesel. This generates an estimated $1,200,000 annually of which $645,000 goes
towards operation and maintenance items and leaves only $555,000 available for capital projects.
The City also collects a utility tax on gas and electric of which 1/3 of that amount is pledged for storm
sewer maintenance and construction. This generates an estimated $744,000 per year of which $673,000
goes towards operation and maintenance items and $71,000 is available for capital projects.
In total, $5.68 Million is budgeted/programmed for streets, sidewalks, and storm sewers annually.
However, only $1.42 million is available for capital projects annually. In 2022, construction prices rose
close to 40% which severely reduced the number of projects the City was able to do in 2022 and in future
years. Further, gas tax revenue is flat or falling and will continue to fall into the future as electric vehicles
become more prevalent. In projecting the cost out for the next 20 years, assuming the same funding
amounts are received as in 2023 and that construction costs will increase 3% each year, there will be a
projected shortfall of $65.7 million in order to keep the City's roads in good condition. For 2023 the City
would need an additional 1.47 million and would need to have this same additional amount each year
with a 3% inflation factor in order to get the roads in a good condition. Additional details are provided in
the linked information.19
To fund such a program and keep the City’s current expenditures neutral to its current obligations, the
City would need to find a revenue source that could be used to support general government activities,
capital infrastructure improvements, and a community center, without negatively impacting the City’s
bond rating, as was cautioned by the financial advisor at the November 14, 2022 City Council meeting. It
19 Street Funding Presentation, Cost Estimate Spreadsheet, Environmental Testing
9
was also determined that the proposed Home-Rule Sales Tax increase would result in a minimum negative
impact to the community.
The Home-Rule Sales Tax option provides the City with the ability to generate $950,000 annually as a new
revenue to support the City’s general government operations, which would include a capital infrastructure
improvement campaign, and yes, a community center. Additionally, the 2011C bonds maturing in 2023
will free up an additional $323,000 in 2023 that can aid in general government operations as well as a
more robust capital infrastructure improvement program.
When the City’s satisfaction survey was completed 20, the highest priority identified within that survey was
the quality of city streets, as reflected in the below table:
While the option to use bond debt might expand the reach of an infrastructure improvement campaign
within a shorter period, it is not required. But one such reasonable scenario would be to use all or a
portion of the Home Rule-Sales Tax proceeds to cover bond debt payments in order to expedite the capital
infrastructure improvement program. One such option that the City staff looked at was a twenty year
term, which would have generated $17.8 million for street improvements throughout the City. But a 20
year term may be too aggressive in the current market. It was also recognized that current City staff may
be able to better manage a capital Infrastructure campaign with the new revenues without bonding, and
effectively keep pace with an annual capital infrastructure improvement strategy.
However, funding a community center might require a bonding process that could be funded from the
2011C maturing bonds ($323,000), and a portion of the Home Rule quarter cent sales tax. But such an
initiative would not require a 20 year issuance, but rather a five to seven year term. Additionally, there is
presently a discussion regarding the establishment of a fundraising campaign to aid in the construction of
the community center, and various programming initiatives. If this is the case, the need for bonding would
be further reduced, and donors would be able to take a tax deduction on their contributions. But if the
City bonded the full estimated amount of $7.3 million for the community center, the interest on that
issuance would be at 5%, or approximately $1.133 million in interest on a 5 year term, and $2.106 million
in interest on a 10 year term.21
20Community Survey Findings Report, Community Survey Maps, Community Survey Presentation by ETC
21 5 year bond schedule, 10 year bond schedule
10
As for the impact of a Home Rule quarter
cent sales tax increase, the below table
highlights what that would mean for the
following expenditure(s), with the net
impact represented in the yellow
highlighted section.
In short, the proposed Home Rule quarter
cent sales tax, regardless as to how it is used (for general government operations, capital infrastructure
improvement campaign, or even a community center) would not negatively impact our community but
would put the city in a better position in reinvesting in our community, its infrastructure, its youth and
much more.
Previously, it was publicly stated that by adapting the Home Rule quarter cent sales tax, the City will place
Galesburg on the equivalent scale as that of Chicago, but if you take a closer look at other local
communities and their sales tax burdens comparative to the City of Galesburg, we find that Galesburg
remains comparable in both the food & beverage tax, and at the lower end on the Home Rule Sales Tax
table, even with the Home Rule quarter cent sales increase added on, which is further explained by the
Mayor below.
Current Sales Tax Chart
Sales Tax Chart – with the proposed increase
11
Mayor Schwartzman conducted a study of the 48 Illinois cities similar to Galesburg in population (ranging
in size from 25,000 to 40,000 residents). He found that (see graphs which show current rates): (1)
Galesburg's current home-rule sales tax rate is 1.00% (which is lower than the average of the group
(1.07%) and Galesburg's total sales tax rate (retail) (at 8.75%) is slightly higher than the group's average
(8.56%). Relative to cities nearby Galesburg that are roughly the same size, our "City Sales Tax" (at 1.00%
or even 1.25% as proposed) compares favorably: Quincy: 1.50%, Rock Island: 1.25%, Moline: 1.25%, Pekin:
1.75%, and East Peoria: 1.75%. Based on this information, his recommended increase to 1.25% for
Galesburg (the "quarter percent" increase) is not going to put Galesburg at a competitive disadvantage.
Recap
Getting the Home-Rule quarter cent sales tax approved would provide the City the ability to resolve the
funding for both initiatives (e. g., Capital Infrastructure Improvement Program and the Community
Center), and would begin the process to refine the usage within the facility, and how other collaborative
partners might be able to support and utilize the facility as well. If there is no source of funding committed
to either of the two initiatives, then any further work with City consultants would more than likely come
to a grinding halt.
An additional option might be to earmark the 2011C maturing bonds ($323,000) and a portion of the
newly established Home-Rule quarter cent sales tax, into a Galesburg Community Center reserve fund
over the course of a year. This approach would allow the community to work to clearly define the scope
of work, initiate a campaign for donations towards the community center, pursue state or federal funding
12
opportunities should they become available within that time period, and work with other community
stakeholders and determine what, if any, financial commitments could be made to support the ongoing
operations of the community center. Once the year has expired, the City could then proceed to finance
the project based on the actual funds required once the fundraising campaign has been completed and
the qualified portion tied to the construction of the facility has been combined. While this approach would
delay the construction of the facility, another option would be to proceed forward with the construction
of the facility and include any donated funds to the project as they come in.
A number of draft operating budgets for the community center had been established but are all based on
hypothetical speculative information that make assumptions that have yet to be determined such a
collaboration with the school district and funding opportunities that they may be able to bring to the
table, and a host of other collaborative partners, all of whom have yet to make any commitment to use
the facility.
While these collaborative relationships have yet to be established, it is understood that there is great
interest with these groups to find a way to partner with the City in support of the Galesburg Community
Center. Nevertheless, for the purposes of transparency, we have attached as general information to this
report, but would caution that it is merely speculative at this stage of the process.22
Additionally, back when the idea emerged to look into the construction of a Community Center, there
were grant funding opportunities available at that time that would have assisted the City in financially
supporting that endeavor, but there are presently no grant programs currently available at this present
time. Nevertheless, the desire to meet this need for the community requires that we push forward today,
and should grant opportunities become available, the City will pursue them as well, but for now, the
majority of the leadership on the City Council believe that it is imperative to move forward with
establishing the funding solution now and begin the process to further define the scope of the facilities
usage along the way. It is also their desire to begin the process to establish a capital infrastructure
improvement program as well.
Finally, this executive summary provides an additional Q/A section that is attached as Appendix “A” to
address other questions that have been raised, as well as a community wide virtual town Hall meeting
that will be held at 6pm, on Wednesday, December 14, 2022 for those that can attend virtually, or in
person at the City Hall.
22 Memo regarding revenue sources, including non-profit questionnaire results
13
Appendix A
Question/Answers
Has a budget for the community center been developed?
A number of draft operating budgets for the community center have been established but are all based
on hypothetical speculative information that make assumptions that have yet to be determined such a
collaboration with the school district and funding opportunities that they may be able to bring to the
table, and a host of other collaborative partners, all of whom have yet to make any commitment to use
the facility.23
What has been the past role of Carver Center in providing community center services?
Questions have been raised about the past role of Carver Center as a community center. In June 2015, the
City did enter into an agreement with Carver Center to provide funding for building improvements for the
Boys and Girls Club. As the outcome of that agreement, the City expended $55,448.48, which is outlined
below. The City paid for this from the profit of $114,446.50 from selling the old community center.
$114,445.50 2013 Sale of old community center proceeds
($55,120.70) 2015 HVAC work done at Boys & Girls Club
($327.78) 2015 Boys & Girls Club WiFi boxes
$ 3,513.34 Interest income
$ 62,510.36 Remaining balance of proceeds from the sale of the old community center
The Carver Center was destroyed by a fire in September 2016 and did not rebuild their facility. There has
been speculation about what was done with the insurance money, as the facility was not rebuilt. Carver
Center is not owned or operated by the City of Galesburg, and therefore the use of their insurance money,
and their selection of whether or not to rebuild is between them and their insurance carrier. The contract
does allow for termination of the contract with two months’ notice, and the City’s total expenditure was
limited to $55,448.48, which was utilized for building improvements prior to the fire. While it is certainly
unfortunate that their organization is no longer providing community center services, their prior
assistance from the City of $55,448.48 in 2015 does not obligate them to continue operation as a
community center indefinitely, and/or report to the City their organizational decisions regarding their
insurance policy and its use.24
What will be in the community center?
There have been many preliminary discussions regarding what City Council Members would like to see
included at the community center, including City Council interviews with the consultant from Farnsworth
Group, so that could be taken into consideration with the development of site selection analysis.25
Non-profit groups were also polled for their initial feedback on their potential involvement with the
Community Center.26
23 Draft budget with most recent considerations incorporated
24 Council items related to the Carver Center Boys and Girls Club, Item 15-4033 failed, Item 15-4066 approved
25 Farnsworth Site Selection Presentation, September 26, 2022
26 Memo regarding revenue sources, including non-profit questionnaire results
14
What is the value of a community center?
Mayor Schwartzman prepared a “White Paper” in November 2022 summarizing the findings of five
independent reports (and one interview) on the social and economic benefits of community centers. Here
were the questions that he was attempting to answer: (1) Do community centers add economic value to
the city’s where they are found/built? (2) Are community centers valued by their residents? (3) What
types of activities are key to the positive impact of a community center? This report can be obtained by
emailing the Mayor at pschwart@ci.galesburg.il.us.
Is grant funding available?
There could be a misconception that the development of a community center will be partially or
completely funded through grants. While that could be possible, at this time, there are no open grant
opportunities that staff have currently identified to fund or partially fund the project, building
renovations, or programs. While City staff will be aggressive in pursuing any grant opportunities which
could be beneficial to the community center, this project is contingent on the City funding all needed costs
for the project at this time. As the project continues to develop, City staff will have a better idea of the
scope, for any potential grant opportunity matches that may open.
Information was previously provided on the IDNR PARC Grant. This grant application process was in 2020,
and awarded for 2021. However, only eight total projects throughout the state were awarded – it’s a
competitive grant. The grant for a single project can only receive a maximum award of 10% of the total
pot of funds available, and in 2021, there was $25 million available, meaning the maximum possible grant
size would be $2.5M, if the project were to be selected through the competitive process for the maximum
award. In addition, the grant has not been opened again since 2021, and staff at IDNR have indicated they
do not know when or if it will be offered again, as the program does not run on a regular schedule and is
subject to the sale of bonds for funding.27
27 PARC Grant Memo Dated December 6, 2021
15
Bibliography (footnotes)
1 May 20, 2013 – Ordinance on 1st Reading to sell Community Center 150 E Simmons St. to Mark Kleine for Iron Spike for $115,000.
Residents spoke in opposition to the sale. Link to minutes with relevant sections highlighted.
2 June 3, 2013 – Ordinance on Final Reading to sell Community Center. Residents spoke out against the sale at the meeting or to
have a suitable alternative available. Item 13-1022 was approved, 6 yes, 1 absent. Link to minutes with relevant sections
highlighted.
3 April 6, 2015 – Agreement for community center services to be provided by the Boys and Girls Club at the Carver Center. Item
15-4033 was tabled and amended several times, ultimately failing, replaced with item 15-4066 below.
4 June 15, 2015 – Agreement with Boys & Girls Club at the Carver Center for building improvements. Item 15-4066 was approved,
6 yes, 1 absent.
5 November 2, 2021 – City Council Work Session to review the proposed budget. As part of that meeting a memo was provided
and discussed by the Council at the work session. The memo estimated operating expenses and possible uses in the building.
6 November 15, 2021 – Council hired Farnsworth to provide a code study of the building and determine estimates of costs for
bringing the building into compliance with all building codes. Item 21-4108 was approved, 5 Yes, 2 Abstain
7 November 29, 2021 – City Council toured the Churchill building to get a general sense of its layout, space, and condition. This
was a Galesburg City Council meeting and was therefore publicly noticed and open to the public.
8 March 21, 2022 – Request for direction from Council on acquiring the Churchill property. Item 22-4032 was approved, 4 Yes 3
No.
9 April 18, 2022 – Ordinance on first reading for IGA to purchase Churchill property, Item 22-1013.
10 April 18, 2022 – Resolution placing an advisory question on the ballot “Should the City of Galesburg spend between $5
million and $10 million to convert the former Churchill Middle School into a community/activity center?” Item 22-2023 failed, 3
Yes 4 No.
11 April 28, 2022 – Ald. White and Ald. Smith-Esters held open house for Churchill for the public to walk through the building and
provide comments. Members of the Youth Commission participated and helped give tours, approximately 45 citizens, plus a few
school staff attended.
12 May 2, 2022 – Ordinance on final reading for IGA to purchase Churchill property. Item 22-1013 was approved, 4 Yes, 3 No.
13 June 20, 2022 – City Council approved agreement with Farnsworth for evaluation of alternative locations and options for the
Community Center to evaluate if it would be better to renovate or build new. Item 22-4049 was approved, 4 Yes, 1 No, 1 Abstain,
1 Absent.
14 September 26, 2022 – City Council work session to review proposed community center options with Farnsworth Group who
provided a presentation on potential locations. Please note – estimates were updated after this presentation.
15 November 14, 2022 – City Council work session provided overview of the City’s finances and discussed selecting a location for
the Community Center. A straw poll was taken of the Council and 4 voted in favor of the Churchill location and staff was
directed to move forward with that option.
16 November 21, 2022 – City Council considered a resolution to hold a Community Center Public Hearing to gather public input
on the location for the proposed community center. Item 22-2070 failed, 3 Yes, 3 No.
17 December 5, 2022 – City Council considered selecting Churchill as the community center location. Item 22-4115 was
approved, 4 yes, 3 no.
18 Environmental conditions memo.
19 Street Funding Presentation, Cost Estimate Spreadsheet, Environmental Testing
20 Community Survey Findings Report, Community Survey Maps, Community Survey Presentation by ETC
21 5 year bond schedule, 10 year bond schedule
22 Memo regarding revenue sources, including non-profit questionnaire results
23 Draft budget with most recent considerations incorporated
24 Council items related to the Carver Center Boys and Girls Club, Item 15-4033 failed, Item 15-4066 approved
25 Farnsworth Site Selection Presentation, September 26, 2022
26 Memo regarding revenue sources, including non-profit questionnaire results
27 1PARC Grant Memo Dated December 6, 2021
All footnote documents, combined (note: large file size, due to length of 2,364 pages. All documents are also available via the
referenced individual links.)