2023 PROJECTS
H.U.D. GRANT — LEAD PAINT HAZARD REDUCTION PROGRAM
$3,675,709.75 5/1/19 to 9/30/23 (no new applications after 9/30/23)
*Funds from a previous Help Eliminate Lead Program (HELP) have also been used to supplement
renovations in this program.
Renovations on 68 homes have been completed, 15 homes are under contract and will be
completed soon.
Before
Afte r
Before
461
®ate
CITY
••�'IV, 77
2023 PROJECTS
• IHDA HOUSING REPAIR AND ACCESSIBILITY GRANT $400,000 - 3/15/23 to 3/15/25
Anticipate at least 9 homes, of which at least 5 roof only projects and 4 Full Renovation or
Accessibility. At least 70% of homes must be done in Census Tracts 6 through 11
Applications are closed and WIRC is reviewing and seeking approvals through IHDA
CITY
••�'IV, 77
2023 PROJECTS
• HOUSING REPAIR ASSISTANCE PROGRAM
$112,500 FY23, maximum $4,500 per home
Improvements on 14 homes have been completed, 3 additional projects have been approved.
5.6%
5.6%
5.6%
5.6%
11.1%
22.2%
• Furnace
• Roof
Sewer Line
• Water Heater
Steps
• Porch
Exterminatien
Accessibility
2023 PROJECTS
• DEMOLITION PROGRAM - $337,500 -
CITY ••�'IV, 77
o 7 residential properties have been demolished and 7 more are under contract to be completed
before year end.
29 Public Square (former Broadview hotel) project is almost closed out
140-144 E Main St is under contract and will be completed within 90 days
o 91 W Simmons St is under contract and should be completed within 90 — 110 days
FUTURE PROJECTS (2024)
• HOUSING REPAIR ASSISTANCE PROGRAM
$112,500 has been placed in the FY24 budget to continue this program
• IHDA HOUSING REPAIR AND ACCESSIBILITY PROGRAM
This is an
existing grant
previously mentioned and
renovations will
begin in FY 24.
It assists
low-income
homeowners with health,
safety, energy
efficiency and
accessibility improvements
• DCEO SINGLE FAMILY OWNER OCCUPIED HOUSING REHABILITATION
Western Illinois Regional Council is working on the grant application which will be
due in January, and we anticipate asking for the maximum of $650,000.
• Potential other grants
We are always on the lookout for other possibilities. In the coming months we will be discussing with WIRC
about the Pathways to Removing Obstacles to Housing (PRO Housing) grant and the Healthy Homes grant
which are both through HUD as potential opportunities to apply for in FY24.
FUTURE PROJECTS (2024)
• SUBDIVISION HOUSING INFRASTRUCTURE GRANT
$400,000 to assist a developer with public infrastructure expenses related to constructing new
Residential Housing Subdivision
• POTENTIAL HOUSING PROJECT
We are underway with a Housing Study and anticipate it will be completed in Spring/Summer
2024. Recommended projects would then be planned and placed in the 2025 budget, but if there
are low cost recommendations, we have a small amount of funds in the FY24 budget for a minor
project that could be done immediately.
• KNOX LAUNDRY ENVIRONMENTAL CLEANUP
FY23 we were approved for a Targeted Brownfield Assessment and the Illinois Environmental
Protection Agency has been on site for testing and is working on the report. Once received, we
anticipate being eligible to apply for Federal grant opportunities for remediation. In case local
match is required, we have funds in the FY24 budget.
FUTURE PROJECTS (2024)
• TRANSIT
• We have a $900,000 IDOT grant toward purchase of 2 fixed route buses (*we have a request in to IDOT
to use these funds on Medium to Super Duty buses instead of larger fixed route buses)
• We have a $100,000 grant to purchase new dispatch software to replace an older system that does
not meet current scheduling needs. The new software will allow dispatchers to see all client
schedules at one time and the location of buses in real time to make scheduling more efficient.
• We have a $150,000 grant to conduct a comprehensive study of our transportation system and the
potential for expanding into Knox County
I�I
CITY OF
GALESBURG
FUTURE PROJECTS (2024)
• DEMOLITION PROGRAM - $3371500
• Awarded $562,000 IHDA Strong Communities grant FY23, should see funds FY24 for more demolitions
• We currently have 6 properties ready to bid out in the beginning of FY24
• We currently have 26 properties in Knox County Court seeking an Order for Demolition
• We currently have 12 properties that have been approved by Council to begin the Demolition process
• 236-238-240 S Seminary St - this demolition will be bid out and completed
Public Works
CAPITAL PROJECTS 2024
2023 COMPLETED PROJECTS
AIRPORT
■ TAXIWAY B RESURFACING PROJECT
i ell IN CITY � �B R
OCNSTRUC11CIN EOUIPMENT AHD EMPLOYEE
PARKING ([A 11) I
ILL HE ;'ERFOiMEJ BET'AEEM THESE
TS At.D THE RLWAV AITH3kiT CLANG
RUk WAY TC AIRCRAFT TRAFFIC
CONSTRUCTION OPERATICNS 7URI40
VARIOUS STAGES OF CONSTRUCTION
(Typ}
2024 PROJECTS
AIRPORT
AIRPORT LAYOUT PLAN
(Kickoff 2023)
REPLACE AIRPORT FUEL FARM — ACIP
(Kickoff 2023)
OVERLAY NORTHERN HALF OF APRON PAVEMENT
AIRPORT PARKING LOT & ACCESS ROADWAY— ACI P
REPLACE AIRPORT MAINTENANCE BUILDING
vi CITY •,
GALESBURG MUNICIPAL AIRPORT
GALESBURG, MUNOIS
AIRPORT LAYOUT PLAN
RGBG-3 Overvlewjpg
wwa?
2023 COMPLETED PROJECTS
ENGINEERING & STREET DIVISION
City completed the following projects through various
funding sources:
Irwin Street Reconstruction -Grove Street To Losey Street
McClure Street - Monmouth Blvd To Coulter
(Reconstruct Concrete Pavement)
Miscellaneous Curb & Gutter and Sidewalk Replacement
Asphalt Resurfacing Projects — Various Streets
Annual Seal Coating Project — Maintenance
(Asphalt and chip sealing in East section of city)
vCITY OF
GALESBURG
ii7
Irwin Street - after
ANNUAL PROJECTS
(FUNDING: VARIOUS SOURCES)
ENGINEERING & STREET DIVISION
Asphalt Resurfacing Projects - Various Locations
Annual Microsurfacing and Seal Coating Project —
Microsurfacing and seal coating in southeast section of
city and Soangetaha
vCITY OF
GALESBURG
li7
Picnic Drive Seal Coat - 2023
2024 PROJECTS
ENGINEERING & STREET DIVISION
CITY OF GALESBURG -CONCRETE PAVEMENT INSPECTION FORM
Branch Name: Date:
Branch Number. Inspectors:
Section Number.
Any Discrepencies Between Database Printout and Inventory Form? Y N If Yes, Corrections Made? Yes
Type of Curb (circlelmark correct type): None VShaped PCC CCCG Integral Curb Other:
Curb Condition (circlelmark correct condition): (failed) 2 3 4 (excellent) Comment:
Did Section Boundaries Change? Y N Total Number of Sample Units: Before After
If Yes, Why? Number of Samples to Inspect Based on Sampling Rate:
Cursory Inspection Comments Pertaining to Entire Section:
Sidewalk? (Circle one) Brick PCC HMA None Ward Historic District? Y N
DISTRESS TYPES AND CODES
21. Blow-UplBuckling
27. Lane/Shoulder Drop-off
33. Pumping (No Severity)
22. Corner Break
28. Linear Cracking
34. Punchout
23. Divided Slab
29. Patching/Utility Cut (Large)
35. Railroad Crossing
24. Durability 'D'Cracking
30. Patching/Utility Cut (Small)
36. Scaling/Crazing/Map Cracking
25. FaultinglSettlement
31. Polished Aggregate (No Severity)
37. Shrinkage Cracking
26. Joint Seal Damage
32. Popouts (No Severity)
38. Spalling, Corner
(Rate Over Entire Sample)
39. Spalling, Joint
CITY OF
GALESBURG
Statewide Planning & Research Grant — data collection and
pavement rating system
Carl Sandburg Drive Drainage Project
Carl Sandburg Drive Resurfacing Project - Henderson To
Broad
Simmons Street — Prairie to Kellogg & Parking Lot H
Funding: Rebuild Main Street & Downtown Grant
(Engineering In 2023)
DJ E CTS V-1111 ,
r f King Eleme
Lake
l Storey Park • Lake Slorey Ball Fields
Storey ke
' ♦ \'aye
Lakes
Recreation Fa°cil'ty �A
pw
�� t 1 r A .
VL
�^
t i i
L
•BursieWilham,,,IhJ. r L
r•f u�
F r Lake Storey Campgi:ound.
7 I
M69; �
�• • , • 'i - Y 4y
LoglCity Cemetery • !' .T! _i, Glesb •
a' y Mamfactunrito
j . y _ Always T�reveil 11
Cortporate & L/ r. ••
t ii m-rdbu f leisure College ,
W III tarn 'Bill
ILHungate
Basebalj'%
Softball..
C I T Y 0 F
GALESBURG
Division i 24 � T
A-w -
2023 COMPLETED PROJECTS
WATER DIVISON
Completed Projects in 2023
vCITY OF
GALESBURG
ii7
Completed replacement of lead service lines through IEPA
forgivable loan
2024 PROJECTS
WATER PROJECTS
Inspection of 5 miles of transmission main from Oquawka
Replace 3-mile section of transmission main from Oquawka
� rcw
_Y
_G
0 F
Ii,l,
'
GALES
CITY
B R
,i
AT I -IF, LS 111 TIR-C - L;
2024 PROJECTS
WATER PROJECTS
Oquawka filter room repair (controller cabinets, rusted items)
Parking lot rehab —920W. Main (main building)
Tuckpoint interior/exterior brick - 920 W. Main pump station
5-Million Gallon Water Reservoir Replacement
Begin replacing water meters (In-house)
2024 PROJECTS
WATER PROJECTS
PFAS Treatment
Grand Avenue Water Main - in conjunction with IDOT
reconstruction project (Design 2024, Construction 2025)
Henderson Street & Lincoln Park Water Main
Miscellaneous Water Main Projects
2024 Water
Policy Direction
Continued evaluation of PFAS
removal/reduction options for water supply
Develop backup system for existing transmission
line from Oquawka
CITY OF
MEGALESBURG
V1111
in •N[a I 0 FL8• aJGIH.x24iN.FlOUJGE L�
From the collection of Galesburg Public Library
QUESTIONS?
PUBLIC WORKS CAPITAL PROJECTS 2024
.)epa
D a r k al-c
�I w
_.:-- -�. GALESBURG
-- P-, ._.
CITY OF
VVI�I�IIIIIIlr1�1- � i3 --
�"`` ILLINOIS
an-_ - -
qw 11 re, I 51krAmm
All
C�i�-Maurrr
2023-2024 PROJECTS
PARK IMPROVEMENTS
CITY • •B ' IV, 77
2023 and 2024 PROJECT
SEAL COATING OF PARK ROADS
• SEAL COATING OF PARK ROADS
The City contracts portions of roads with various parks each year.
Continue in 2024 as part of the park maintenance plan.
CITY OF
GALESBURG
2023 PROJECTS
Dale Kelley Tot Lot
• Community Input Meetings were Held
• Top Amenities: Fence and Playground Equipment
• Added a row of trees in the Spring, 12 trees planted this Fall
• Trees and cement slabs were removed to improve the area
• Lighting repair for the park
• Fencing is ordered and will be installed
P's CITY ••�'IV, 77
2024 PROJECT
DALE KELLEY PARK
• Dale Kelley Park Improvement
• Mr. Dale Kelley = Basketball
•Construction of a Basketball Court
P's CITY ••�'IV, 77
2024 PROJECTS
PICKLEBALL COURTS
• Pickleball is a growing sport enjoyed by all ages
• Potential Locations:
a) Bateman Park —Current Courts
b) Lakeside Recreation Facility — Indoor Tennis Courts
c) Lakeside Recreation Facility — Outdoor Tennis Courts
d) Lincoln Park — Horseshoe Area
• NEW COURTS:
a) Architect and Engineering
b) Demolition
c) Construction (6 courts)
• BATEMAN PARK- SURFACING OVER EXISTING COURTS:
a)
b)
Installation over the Concrete Base — Most Cost Effective
Improvements to the Park Setting
(Benches/Picnic Tables)
I �i
CITY OF
GALESBURG
2024 PROJECT
LINCOLN PARK RESTROOM
• LINCOLN PARK RESTROOM RENOVATION
CITY • •B ' IV, 77
2023-2024 PROJECTS
BUNKER LINKS GOLF COURSE
t�� -
BUNKER LINKS
G O L F C O U R S E
CITY ••�'IV, 77
,.• � ;'�;:. tip;:, nc''��'��'t- ';��:-*.:_ � ..-...�.+i:.
r 3
.V,bbr,'���`.�_d�_,t��x__•3.�fzrJ
2023 PROJECT
BUNKER LINKS GOLF COURSE
• BRIDGE REPLACEMENT #15
Going to bid —Finish winter/spring
r
1--N-- I 'I.,, . � , . lk
CITY OF
�11�GALESBURG
CITY OF
2024 PROJECT IV, ,GALESBURG
BUNKER LINKS GOLF COURSE
• Bunker Links Cart Path Resurfacing
• Provides a safe and smooth surface for the golf carts,
as well as preventing soil erosion
2024 PROJECT
BUNKER LINKS GOLF COURSE
• BUNKER LINKS GOLF COURSE DRAINAGE
*Assist with elimination of surface water on the course
w
CITY • •B ' IV, 77
2024 PROJECT
BUNKER LINKS GOLF COURSE
• BUNKER LINKS GOLF COURSE DESIGN
P's CITY ••�'IV, 77
• Move Driving Range and Practice Facilities and add Grass/Mat Tees
• Provide modifications to existing Bunker Links Golf Course driving range, hole #6, hole #7 and various course
modifications. Initial phase to include a design for relocating tees and greens.
*Changes #6 to a Par 4 and the Course to a Par 70.
• Additional Discussion: Relocate tee box locations for hole #7, options for multiple tee locations,
netting, grass tee in front of 12-16, covered driving range stations with heat lamps and lights.
2024 PROJECT
BUNKER LINKS COURSE DESIGN
P's CITY OF
•B '
• This has the potential to be over a $1,000,000 + project, depending on the scope of the project
which would be completed in phases.
• Phase I: Architect and Engineering fees - 2024
• Phase II: Relocate Tees/Greens, Change Irrigation /Re-route Line) - 2025
• Phase III: Build Practice Area, Netting-2026
2024 PROJECT
BUNKER LINKS-PHASE
Budgetary Projection —Site Visits/Consultations and Concept Designs
Golf Course Designers
*Site visit
• Course inspection to include consultation
• Specifics for driving range expansion
• Construction quantities / Estimates
DESIGN
• Detailed examination of Golf Course, Driving Range and Practice Facilities
• Qualified Cost Estimate of Project and Timeline
CITY OF
GALESBURG
BUNKER LINKS
L F C 0 U R S E
2023-2024 PROJECTS
Galesburg District #205
CITY • •B ' IV, 77
- CITY OF
GALESBURG
mommor—
2024 PROJECT
GHS Tennis Court Lights
• M USCO Lighting
• 50% of three courts (8 courts)
i
CITY • •B ' IV, 77
CITY OF
2023-2024 PROJECTS vii,11, ,GALESBURG
Hawthorne Municipal Pool
D23 PRUJ
AWTHOF
vilEffele"
i
CITY OF
GALESBURG
2024 PROJECT
CITY OF
GALESBURG
HAWTHORNE MUNICIPAL POOL HVAC
*Scope of work: New HVAC System with air conditioning and dehumidification for
pool and locker rooms. Replacement of the boiler. Replacement of ceiling,
railing, stairs and uniform painting. Asbestos abatement.
D23-2024 PROJECTS
o rev P
ti
4w
2023 PROJECT
EAST BOAT RAMP
• RESTROOM INSTALLED — FALL 2023
• Awarded a BAA D Grant
P's CITY ••�'IV, 77
CITY OF GALESBURG Proposed Past Boat Ramp Restroo[n
I'..rrks Fr nri Rrrre.rlinn it^I�=.rtnna•„ WE
5eprember 01. 2021
CITY OF
2024 PARK PROJECT IV, ,GALESBURG
EAST BOAT RAMP LIGHTING
• Solar Light Installation
• Provide Security from Vandalism and Safety for Patrons
2023-2024 PROJECT
Lake Storey Walk / Bike Trail
• WIDEN AND RESURFACE TRAIL
• This project started just past the East Boat Ramp and went to Joe
Park — 2023
• Continue Path Another 500' - 2024
P's CITY ••�'IV, 77
E. Anderson
i
2023-2024 PROJECT
LAKE STOREY PATH EXTENSION
CITY • •B '
• EXTENSION PROJECT —PLANNING /DESIGN ENGINEERING AGREEMENT -COMPLETED
• Work is scheduled to start in Spring 2024
• ITEP Grant — (Total: $659,030 with $65,910 local match-2023 ITEP)
(TOTAL: $2 million with $355,000 local Match-2021 ITEP)
(Total: $6,940 Local Match from ITEP Grant —TOTAL: $69,370)
Proposed lake Storey Shared -Use Path Extensions
4-E
I
jsro;��•, J � Iirrrorn
Pn i 11 ��% Pnrl
�a
_ - 2021 nEPG—t31
_ �]
0
s
2024 PROJECT
DISC GOLF
Disc Golf brings a park to life (Kiwanis Park) —Current Course
Current Proposal: Build a tournament level course at Lake Storey Park
Class B. not on competing weekends with Quad Cities and Peoria
• Not a Ledgestone Tournament
• Proposed - Lake Storey is busy, as the #1 tourist location
P's CITY ••�'IV, 77
CITY OF
2024 PROJECTGALESBURG
DISC GOLF
• Met with Mr. Wilbur Wallis, PDGA — October 2023
• Offered services to look at hole lengths, elevation, foliage density, and more
• He would input in a program to determine PARS and assist with checking
correct length for scoring separation.
*Consider a site visit to review during the busy summer season to be realistic,
as safety is a priority
This group is willing to pay %2 of the cost in donations
• Undetermined expenses such as cutting through wooded areas and building bridges
across creeks which may require permits
024 PROJECT
41<E STOREY PAF
A�*
zt,
. W-t
'o� K
- CITY OF
GALESBURG
mommor—
z
2023-2024 PROJECTS
OSLAD GRANTS
CITY ••�'IV, 77
• 2022 H.T. CUSTER PARK RENOVATION — GRANT AWARDED — IN PROGRESS
• 2023 LANCASTER PARK RENOVATION — GRANT AWARDED — IN PROGRESS
• 2024 COOKE PARK PROJECT— GRANT APPLIED
(Total Grant: $1,000,000 /City Portion: $500,000)
N
CITY OF
2023-2024 PROJECT IV, ,GALESBURG
H.T. Custer Park - Renovation
• 2022 H.T. CUSTER PARK —GRANT AWARDED
(Total Grant: $8001000 /City Portion: $400,.000 + $225,.000)
• 2023 — Parking Lot behind Ballfield, multi -use pathways, bike training signs,
new playground with poured in place surfacing.
• 2024 —Shelter, Bathroom Installed
e �
• TOTAL: $1,025,,000 Project
2024 PROJECT
H.T. CUSTER BALLFIELD RENOVATION
P's CITY OF
•B '
• Plans include leveling the field, adding fencing, netting, batting cage, pitching area, and new
dugouts to be completed in phases.
2024 PROJECT
P's CITY ••�'IV, 77
H.T. CUSTER BALLFIELD (Continued)
• PHASE I — Infield Grass Concerns and New Netting
• Staff is currently working on leveling the field to help the ballfield condition
• New Netting
*FUTURE PHASES: Add fencing, batting cage, pitching area, and new dugouts
• POTENTIAL TO BE A $1,000,000 PROJECT
2023-2024 PROJECT
P's CITY ••�'IV, 77
Lancaster Park— Park Improvement
• 2023— GRANT AWARDED
• (Total Grant: $449,650, City Portion: $224,825)
• CONSTRUCTION IN 2024
• Scope Includes: New Playground, shelter, %2 court basketball, and path
Ga�e5bU1'g nrtacM1m.n, 1. O.wbgn.nf Plan
RB�iB�Of� ':� CigG�InburM
2024 PROJECT
P's CITY OF
•B '
COOKE PROPERTY PARK DEVELOPMENT
9 Property acquired in 2023 for future development of a park
Scope: Phase I — Playground, walking path, restroom, shelter and pollinator garden
*Support of local group which is fundraising for future amenities
Aft—h—t n-3 development Plan
:e—_r City of Galesburg
D24 PROJECTS
3keside Recreatic
-
4m _
l
�6s
Wpm o$
CITY OF
GALESBURG
lommoff-
—now
4' ?
► '� V'> Ag
VAL
4F- _
2024 PROJECT
LAKESIDE WATER PARK
• NEW PUMP AND MOTOR CIRCULATION
P's CITY ••�'IV, 77
• A new pump and motor are necessary for operation and circulation
�j
2024 PROJECT
P's CITY ••�'IV, 77
LAKESIDE WATER PARK POOL LINER
• Immediate need of pool liner for the 5ft. and waterslidecatch pool
• Prevents leakage and waste of water
2024 PROJECT
LAKESIDE RECREATION FACILITY
• METAL SIDING REPLACEMENT
• Tennis Building
CITY ••�'IV, 77
2024 PROJECT
LAKESIDE RECREATION FACILITY
• LAKESIDE MULTI -PURPOSE COURTS
• Surfacing for Floor
CITY • •B ' IV, 77
2023-2024 PROJECTS
COMMUNITY CENTER
• COMMUNITY CENTER TASK FORCE
a) Meetings every two weeks on Tuesdays
b) 15 Appointed Members by City Council and Mayor
c) Final Report — December 2023 by Task Force Chairperson, Tony Franklin
CITY OF
GALESBURG
CITY OF
GALESBURG
v x
l
µ
Ak
i
i
r
4'