Loading...
HomeMy WebLinkAbout10302023 Work Session All SlidesCommunity Development CITY ••�'IV, 77 2023 PROJECTS H.U.D. GRANT — LEAD PAINT HAZARD REDUCTION PROGRAM $3,675,709.75 5/1/19 to 9/30/23 (no new applications after 9/30/23) *Funds from a previous Help Eliminate Lead Program (HELP) have also been used to supplement renovations in this program. Renovations on 68 homes have been completed, 15 homes are under contract and will be completed soon. Before Afte r Before 461 ®ate CITY ••�'IV, 77 2023 PROJECTS • IHDA HOUSING REPAIR AND ACCESSIBILITY GRANT $400,000 - 3/15/23 to 3/15/25 Anticipate at least 9 homes, of which at least 5 roof only projects and 4 Full Renovation or Accessibility. At least 70% of homes must be done in Census Tracts 6 through 11 Applications are closed and WIRC is reviewing and seeking approvals through IHDA CITY ••�'IV, 77 2023 PROJECTS • HOUSING REPAIR ASSISTANCE PROGRAM $112,500 FY23, maximum $4,500 per home Improvements on 14 homes have been completed, 3 additional projects have been approved. 5.6% 5.6% 5.6% 5.6% 11.1% 22.2% • Furnace • Roof Sewer Line • Water Heater Steps • Porch Exterminatien Accessibility 2023 PROJECTS • DEMOLITION PROGRAM - $337,500 - CITY ••�'IV, 77 o 7 residential properties have been demolished and 7 more are under contract to be completed before year end. 29 Public Square (former Broadview hotel) project is almost closed out 140-144 E Main St is under contract and will be completed within 90 days o 91 W Simmons St is under contract and should be completed within 90 — 110 days FUTURE PROJECTS (2024) • HOUSING REPAIR ASSISTANCE PROGRAM $112,500 has been placed in the FY24 budget to continue this program • IHDA HOUSING REPAIR AND ACCESSIBILITY PROGRAM This is an existing grant previously mentioned and renovations will begin in FY 24. It assists low-income homeowners with health, safety, energy efficiency and accessibility improvements • DCEO SINGLE FAMILY OWNER OCCUPIED HOUSING REHABILITATION Western Illinois Regional Council is working on the grant application which will be due in January, and we anticipate asking for the maximum of $650,000. • Potential other grants We are always on the lookout for other possibilities. In the coming months we will be discussing with WIRC about the Pathways to Removing Obstacles to Housing (PRO Housing) grant and the Healthy Homes grant which are both through HUD as potential opportunities to apply for in FY24. FUTURE PROJECTS (2024) • SUBDIVISION HOUSING INFRASTRUCTURE GRANT $400,000 to assist a developer with public infrastructure expenses related to constructing new Residential Housing Subdivision • POTENTIAL HOUSING PROJECT We are underway with a Housing Study and anticipate it will be completed in Spring/Summer 2024. Recommended projects would then be planned and placed in the 2025 budget, but if there are low cost recommendations, we have a small amount of funds in the FY24 budget for a minor project that could be done immediately. • KNOX LAUNDRY ENVIRONMENTAL CLEANUP FY23 we were approved for a Targeted Brownfield Assessment and the Illinois Environmental Protection Agency has been on site for testing and is working on the report. Once received, we anticipate being eligible to apply for Federal grant opportunities for remediation. In case local match is required, we have funds in the FY24 budget. FUTURE PROJECTS (2024) • TRANSIT • We have a $900,000 IDOT grant toward purchase of 2 fixed route buses (*we have a request in to IDOT to use these funds on Medium to Super Duty buses instead of larger fixed route buses) • We have a $100,000 grant to purchase new dispatch software to replace an older system that does not meet current scheduling needs. The new software will allow dispatchers to see all client schedules at one time and the location of buses in real time to make scheduling more efficient. • We have a $150,000 grant to conduct a comprehensive study of our transportation system and the potential for expanding into Knox County I�I CITY OF GALESBURG FUTURE PROJECTS (2024) • DEMOLITION PROGRAM - $3371500 • Awarded $562,000 IHDA Strong Communities grant FY23, should see funds FY24 for more demolitions • We currently have 6 properties ready to bid out in the beginning of FY24 • We currently have 26 properties in Knox County Court seeking an Order for Demolition • We currently have 12 properties that have been approved by Council to begin the Demolition process • 236-238-240 S Seminary St - this demolition will be bid out and completed Public Works CAPITAL PROJECTS 2024 2023 COMPLETED PROJECTS AIRPORT ■ TAXIWAY B RESURFACING PROJECT i ell IN CITY � �B R OCNSTRUC11CIN EOUIPMENT AHD EMPLOYEE PARKING ([A 11) I ILL HE ;'ERFOiMEJ BET'AEEM THESE TS At.D THE RLWAV AITH3kiT CLANG RUk WAY TC AIRCRAFT TRAFFIC CONSTRUCTION OPERATICNS 7URI40 VARIOUS STAGES OF CONSTRUCTION (Typ} 2024 PROJECTS AIRPORT AIRPORT LAYOUT PLAN (Kickoff 2023) REPLACE AIRPORT FUEL FARM — ACIP (Kickoff 2023) OVERLAY NORTHERN HALF OF APRON PAVEMENT AIRPORT PARKING LOT & ACCESS ROADWAY— ACI P REPLACE AIRPORT MAINTENANCE BUILDING vi CITY •, GALESBURG MUNICIPAL AIRPORT GALESBURG, MUNOIS AIRPORT LAYOUT PLAN RGBG-3 Overvlewjpg wwa? 2023 COMPLETED PROJECTS ENGINEERING & STREET DIVISION City completed the following projects through various funding sources: Irwin Street Reconstruction -Grove Street To Losey Street McClure Street - Monmouth Blvd To Coulter (Reconstruct Concrete Pavement) Miscellaneous Curb & Gutter and Sidewalk Replacement Asphalt Resurfacing Projects — Various Streets Annual Seal Coating Project — Maintenance (Asphalt and chip sealing in East section of city) vCITY OF GALESBURG ii7 Irwin Street - after ANNUAL PROJECTS (FUNDING: VARIOUS SOURCES) ENGINEERING & STREET DIVISION Asphalt Resurfacing Projects - Various Locations Annual Microsurfacing and Seal Coating Project — Microsurfacing and seal coating in southeast section of city and Soangetaha vCITY OF GALESBURG li7 Picnic Drive Seal Coat - 2023 2024 PROJECTS ENGINEERING & STREET DIVISION CITY OF GALESBURG -CONCRETE PAVEMENT INSPECTION FORM Branch Name: Date: Branch Number. Inspectors: Section Number. Any Discrepencies Between Database Printout and Inventory Form? Y N If Yes, Corrections Made? Yes Type of Curb (circlelmark correct type): None VShaped PCC CCCG Integral Curb Other: Curb Condition (circlelmark correct condition): (failed) 2 3 4 (excellent) Comment: Did Section Boundaries Change? Y N Total Number of Sample Units: Before After If Yes, Why? Number of Samples to Inspect Based on Sampling Rate: Cursory Inspection Comments Pertaining to Entire Section: Sidewalk? (Circle one) Brick PCC HMA None Ward Historic District? Y N DISTRESS TYPES AND CODES 21. Blow-UplBuckling 27. Lane/Shoulder Drop-off 33. Pumping (No Severity) 22. Corner Break 28. Linear Cracking 34. Punchout 23. Divided Slab 29. Patching/Utility Cut (Large) 35. Railroad Crossing 24. Durability 'D'Cracking 30. Patching/Utility Cut (Small) 36. Scaling/Crazing/Map Cracking 25. FaultinglSettlement 31. Polished Aggregate (No Severity) 37. Shrinkage Cracking 26. Joint Seal Damage 32. Popouts (No Severity) 38. Spalling, Corner (Rate Over Entire Sample) 39. Spalling, Joint CITY OF GALESBURG Statewide Planning & Research Grant — data collection and pavement rating system Carl Sandburg Drive Drainage Project Carl Sandburg Drive Resurfacing Project - Henderson To Broad Simmons Street — Prairie to Kellogg & Parking Lot H Funding: Rebuild Main Street & Downtown Grant (Engineering In 2023) DJ E CTS V-1111 , r f King Eleme Lake l Storey Park • Lake Slorey Ball Fields Storey ke ' ♦ \'aye Lakes Recreation Fa°cil'ty �A pw �� t 1 r A . VL �^ t i i L •BursieWilham,,,IhJ. r L r•f u� F r Lake Storey Campgi:ound. 7 I M69; � �• • , • 'i - Y 4y LoglCity Cemetery • !' .T! _i, Glesb • a' y Mamfactunrito j . y _ Always T�reveil 11 Cortporate & L/ r. •• t ii m-rdbu f leisure College , W III tarn 'Bill ILHungate Basebalj'% Softball.. C I T Y 0 F GALESBURG Division i 24 � T A-w - 2023 COMPLETED PROJECTS WATER DIVISON Completed Projects in 2023 vCITY OF GALESBURG ii7 Completed replacement of lead service lines through IEPA forgivable loan 2024 PROJECTS WATER PROJECTS Inspection of 5 miles of transmission main from Oquawka Replace 3-mile section of transmission main from Oquawka � rcw _Y _G 0 F Ii,l, ' GALES CITY B R ,i AT I -IF, LS 111 TIR-C - L; 2024 PROJECTS WATER PROJECTS Oquawka filter room repair (controller cabinets, rusted items) Parking lot rehab —920W. Main (main building) Tuckpoint interior/exterior brick - 920 W. Main pump station 5-Million Gallon Water Reservoir Replacement Begin replacing water meters (In-house) 2024 PROJECTS WATER PROJECTS PFAS Treatment Grand Avenue Water Main - in conjunction with IDOT reconstruction project (Design 2024, Construction 2025) Henderson Street & Lincoln Park Water Main Miscellaneous Water Main Projects 2024 Water Policy Direction Continued evaluation of PFAS removal/reduction options for water supply Develop backup system for existing transmission line from Oquawka CITY OF MEGALESBURG V1111 in •N[a I 0 FL8• aJGIH.x24iN.FlOUJGE L� From the collection of Galesburg Public Library QUESTIONS? PUBLIC WORKS CAPITAL PROJECTS 2024 .)epa D a r k al-c �I w _.:-- -�. GALESBURG -- P-, ._. CITY OF VVI�I�IIIIIIlr1�1- � i3 -- �"`` ILLINOIS an-_ - - qw 11 re, I 51krAmm All C�i�-Maurrr 2023-2024 PROJECTS PARK IMPROVEMENTS CITY • •B ' IV, 77 2023 and 2024 PROJECT SEAL COATING OF PARK ROADS • SEAL COATING OF PARK ROADS The City contracts portions of roads with various parks each year. Continue in 2024 as part of the park maintenance plan. CITY OF GALESBURG 2023 PROJECTS Dale Kelley Tot Lot • Community Input Meetings were Held • Top Amenities: Fence and Playground Equipment • Added a row of trees in the Spring, 12 trees planted this Fall • Trees and cement slabs were removed to improve the area • Lighting repair for the park • Fencing is ordered and will be installed P's CITY ••�'IV, 77 2024 PROJECT DALE KELLEY PARK • Dale Kelley Park Improvement • Mr. Dale Kelley = Basketball •Construction of a Basketball Court P's CITY ••�'IV, 77 2024 PROJECTS PICKLEBALL COURTS • Pickleball is a growing sport enjoyed by all ages • Potential Locations: a) Bateman Park —Current Courts b) Lakeside Recreation Facility — Indoor Tennis Courts c) Lakeside Recreation Facility — Outdoor Tennis Courts d) Lincoln Park — Horseshoe Area • NEW COURTS: a) Architect and Engineering b) Demolition c) Construction (6 courts) • BATEMAN PARK- SURFACING OVER EXISTING COURTS: a) b) Installation over the Concrete Base — Most Cost Effective Improvements to the Park Setting (Benches/Picnic Tables) I �i CITY OF GALESBURG 2024 PROJECT LINCOLN PARK RESTROOM • LINCOLN PARK RESTROOM RENOVATION CITY • •B ' IV, 77 2023-2024 PROJECTS BUNKER LINKS GOLF COURSE t�� - BUNKER LINKS G O L F C O U R S E CITY ••�'IV, 77 ,.• � ;'�;:. tip;:, nc''��'��'t- ';��:-*.:_ � ..-...�.+i:. r 3 .V,bbr,'���`.�_d�_,t��x__•3.�fzrJ 2023 PROJECT BUNKER LINKS GOLF COURSE • BRIDGE REPLACEMENT #15 Going to bid —Finish winter/spring r 1--N-- I 'I.,, . � , . lk CITY OF �11�GALESBURG CITY OF 2024 PROJECT IV, ,GALESBURG BUNKER LINKS GOLF COURSE • Bunker Links Cart Path Resurfacing • Provides a safe and smooth surface for the golf carts, as well as preventing soil erosion 2024 PROJECT BUNKER LINKS GOLF COURSE • BUNKER LINKS GOLF COURSE DRAINAGE *Assist with elimination of surface water on the course w CITY • •B ' IV, 77 2024 PROJECT BUNKER LINKS GOLF COURSE • BUNKER LINKS GOLF COURSE DESIGN P's CITY ••�'IV, 77 • Move Driving Range and Practice Facilities and add Grass/Mat Tees • Provide modifications to existing Bunker Links Golf Course driving range, hole #6, hole #7 and various course modifications. Initial phase to include a design for relocating tees and greens. *Changes #6 to a Par 4 and the Course to a Par 70. • Additional Discussion: Relocate tee box locations for hole #7, options for multiple tee locations, netting, grass tee in front of 12-16, covered driving range stations with heat lamps and lights. 2024 PROJECT BUNKER LINKS COURSE DESIGN P's CITY OF •B ' • This has the potential to be over a $1,000,000 + project, depending on the scope of the project which would be completed in phases. • Phase I: Architect and Engineering fees - 2024 • Phase II: Relocate Tees/Greens, Change Irrigation /Re-route Line) - 2025 • Phase III: Build Practice Area, Netting-2026 2024 PROJECT BUNKER LINKS-PHASE Budgetary Projection —Site Visits/Consultations and Concept Designs Golf Course Designers *Site visit • Course inspection to include consultation • Specifics for driving range expansion • Construction quantities / Estimates DESIGN • Detailed examination of Golf Course, Driving Range and Practice Facilities • Qualified Cost Estimate of Project and Timeline CITY OF GALESBURG BUNKER LINKS L F C 0 U R S E 2023-2024 PROJECTS Galesburg District #205 CITY • •B ' IV, 77 - CITY OF GALESBURG mommor— 2024 PROJECT GHS Tennis Court Lights • M USCO Lighting • 50% of three courts (8 courts) i CITY • •B ' IV, 77 CITY OF 2023-2024 PROJECTS vii,11, ,GALESBURG Hawthorne Municipal Pool D23 PRUJ AWTHOF vilEffele" i CITY OF GALESBURG 2024 PROJECT CITY OF GALESBURG HAWTHORNE MUNICIPAL POOL HVAC *Scope of work: New HVAC System with air conditioning and dehumidification for pool and locker rooms. Replacement of the boiler. Replacement of ceiling, railing, stairs and uniform painting. Asbestos abatement. D23-2024 PROJECTS o rev P ti 4w 2023 PROJECT EAST BOAT RAMP • RESTROOM INSTALLED — FALL 2023 • Awarded a BAA D Grant P's CITY ••�'IV, 77 CITY OF GALESBURG Proposed Past Boat Ramp Restroo[n I'..rrks Fr nri Rrrre.rlinn it^I�=.rtnna•„ WE 5eprember 01. 2021 CITY OF 2024 PARK PROJECT IV, ,GALESBURG EAST BOAT RAMP LIGHTING • Solar Light Installation • Provide Security from Vandalism and Safety for Patrons 2023-2024 PROJECT Lake Storey Walk / Bike Trail • WIDEN AND RESURFACE TRAIL • This project started just past the East Boat Ramp and went to Joe Park — 2023 • Continue Path Another 500' - 2024 P's CITY ••�'IV, 77 E. Anderson i 2023-2024 PROJECT LAKE STOREY PATH EXTENSION CITY • •B ' • EXTENSION PROJECT —PLANNING /DESIGN ENGINEERING AGREEMENT -COMPLETED • Work is scheduled to start in Spring 2024 • ITEP Grant — (Total: $659,030 with $65,910 local match-2023 ITEP) (TOTAL: $2 million with $355,000 local Match-2021 ITEP) (Total: $6,940 Local Match from ITEP Grant —TOTAL: $69,370) Proposed lake Storey Shared -Use Path Extensions 4-E I jsro;��•, J � Iirrrorn Pn i 11 ��% Pnrl �a _ - 2021 nEPG—t31 _ �] 0 s 2024 PROJECT DISC GOLF Disc Golf brings a park to life (Kiwanis Park) —Current Course Current Proposal: Build a tournament level course at Lake Storey Park Class B. not on competing weekends with Quad Cities and Peoria • Not a Ledgestone Tournament • Proposed - Lake Storey is busy, as the #1 tourist location P's CITY ••�'IV, 77 CITY OF 2024 PROJECTGALESBURG DISC GOLF • Met with Mr. Wilbur Wallis, PDGA — October 2023 • Offered services to look at hole lengths, elevation, foliage density, and more • He would input in a program to determine PARS and assist with checking correct length for scoring separation. *Consider a site visit to review during the busy summer season to be realistic, as safety is a priority This group is willing to pay %2 of the cost in donations • Undetermined expenses such as cutting through wooded areas and building bridges across creeks which may require permits 024 PROJECT 41<E STOREY PAF A�* zt, . W-t 'o� K - CITY OF GALESBURG mommor— z 2023-2024 PROJECTS OSLAD GRANTS CITY ••�'IV, 77 • 2022 H.T. CUSTER PARK RENOVATION — GRANT AWARDED — IN PROGRESS • 2023 LANCASTER PARK RENOVATION — GRANT AWARDED — IN PROGRESS • 2024 COOKE PARK PROJECT— GRANT APPLIED (Total Grant: $1,000,000 /City Portion: $500,000) N CITY OF 2023-2024 PROJECT IV, ,GALESBURG H.T. Custer Park - Renovation • 2022 H.T. CUSTER PARK —GRANT AWARDED (Total Grant: $8001000 /City Portion: $400,.000 + $225,.000) • 2023 — Parking Lot behind Ballfield, multi -use pathways, bike training signs, new playground with poured in place surfacing. • 2024 —Shelter, Bathroom Installed e � • TOTAL: $1,025,,000 Project 2024 PROJECT H.T. CUSTER BALLFIELD RENOVATION P's CITY OF •B ' • Plans include leveling the field, adding fencing, netting, batting cage, pitching area, and new dugouts to be completed in phases. 2024 PROJECT P's CITY ••�'IV, 77 H.T. CUSTER BALLFIELD (Continued) • PHASE I — Infield Grass Concerns and New Netting • Staff is currently working on leveling the field to help the ballfield condition • New Netting *FUTURE PHASES: Add fencing, batting cage, pitching area, and new dugouts • POTENTIAL TO BE A $1,000,000 PROJECT 2023-2024 PROJECT P's CITY ••�'IV, 77 Lancaster Park— Park Improvement • 2023— GRANT AWARDED • (Total Grant: $449,650, City Portion: $224,825) • CONSTRUCTION IN 2024 • Scope Includes: New Playground, shelter, %2 court basketball, and path Ga�e5bU1'g nrtacM1m.n, 1. O.wbgn.nf Plan RB�iB�Of� ':� CigG�InburM 2024 PROJECT P's CITY OF •B ' COOKE PROPERTY PARK DEVELOPMENT 9 Property acquired in 2023 for future development of a park Scope: Phase I — Playground, walking path, restroom, shelter and pollinator garden *Support of local group which is fundraising for future amenities Aft—h—t n-3 development Plan :e—_r City of Galesburg D24 PROJECTS 3keside Recreatic - 4m _ l �6s Wpm o$ CITY OF GALESBURG lommoff- —now 4' ? ► '� V'> Ag VAL 4F- _ 2024 PROJECT LAKESIDE WATER PARK • NEW PUMP AND MOTOR CIRCULATION P's CITY ••�'IV, 77 • A new pump and motor are necessary for operation and circulation �j 2024 PROJECT P's CITY ••�'IV, 77 LAKESIDE WATER PARK POOL LINER • Immediate need of pool liner for the 5ft. and waterslidecatch pool • Prevents leakage and waste of water 2024 PROJECT LAKESIDE RECREATION FACILITY • METAL SIDING REPLACEMENT • Tennis Building CITY ••�'IV, 77 2024 PROJECT LAKESIDE RECREATION FACILITY • LAKESIDE MULTI -PURPOSE COURTS • Surfacing for Floor CITY • •B ' IV, 77 2023-2024 PROJECTS COMMUNITY CENTER • COMMUNITY CENTER TASK FORCE a) Meetings every two weeks on Tuesdays b) 15 Appointed Members by City Council and Mayor c) Final Report — December 2023 by Task Force Chairperson, Tony Franklin CITY OF GALESBURG CITY OF GALESBURG v x l µ Ak i i r 4'