Facade Advisory Committee Agenda
Meeting – 9:30 a.m.
Erickson Conference Room
September 2, 2025
AGENDA
Approve Minutes of October 1, 2024 meeting
Receive General Citizen Comment
FAC-25-0901 Consider Downtown Facade Grant – 331-337 E Main St
Adjournment
COMMITTEE MEMBERS: PLEASE NOTIFY ME IF YOU ARE UNABLE TO ATTEND AT 309-345-3619.
cc:
City Manager
Executive Secretary
Deputy City Clerk
Code Compliance Supervisor
Construction Inspectors (3)
Account Clerk
Buildings & Grounds
File Copy
____________________________________________________________________________
Page 1 of 1
MINUTES
FACADE ADVISORY COMMITTEE
ADMINISTRATION CONFERENCE ROOM OF GALESBURG CITY HALL
October 1, 2024 at 9:30 a.m.
MEMBERS PRESENT: Jay Bullis, Steve Gerstenberger, Mike Holloway Carla Markwart, 4.
MEMBERS ABSENT: Mark Martin, Ralph Scott, 2.
OTHERS PRESENT: Steve Gugliotta, AICP.
The meeting was called to order at 9:32 a.m.
Approve Minutes of the December 5, 2023 meeting
Member Gerstenberger moved to approve the minutes, seconded by Member
Markwart.
Minutes were approved by voice vote.
Consider Citizen Comment
No citizen comments.
FAC-24-1001 Consider Downtown Facade Grant – 149 N Broad St
Members discussed the scope of work within the various bids. A question was also raised about
the source funds to complete the project, the applicant stated it has been worked out with their
accountant but was unsure of the specifics. They will speak with the owner and let the city staff
know.
Member Holloway made a motion to recommend approval of the facade grant, seconded by
Member Gerstenberger.
Roll Call #1
Ayes: Bullis, Gerstenberger, Holloway Markwart, 4.
Nays: None.
Abstentions: None.
Chairperson declared the motion approved.
There being no further business, Member Markwart made a motion to adjourn, seconded by
Member Gerstenberger, the meeting adjourned at 9:45 a.m.
Stephen Gugliotta, AICP
COMMUNITY DEVELOPMENT DEPARTMENT
Operating Under Council – Manager Government Since 1957
____________________________________________________________________________
Page 1 of 1
Facade Advisory Committee Letter
August 26, 2025
AGENDA ITEM: FAC-25-0901 Downtown Façade Grant for 331-337 E Main Street.
BACKGROUND: Attached for the Committee’s review is a facade grant application from One Percent
Better, LLC, for proposed facade improvements at 331-337 E Main St.
One Percent Better, LLC is proposing to renovate the façade of 331-337 E Main St and open Orange
Cup Side Car in the vacant retail space. Façade renovation includes painting the metal façade,
installing a circular perpendicular sign, and replacing the existing awning with one that extends the
full width of the sidewalk frontage. It is anticipated 3 full-time and 7-10 part-time jobs will be created
as a result of this project.
If approved, the owner anticipates beginning work on September 17, 2025, with an estimated
completion by October 15, 2025. The estimated total façade project cost is $31,731.48 and they are
eligible to request up to $15,865.74 through the facade grant program.
We have received the following information:
• Proof of Owner consent to apply and building ownership
• Proof the taxes are current
• Proof of insurance from the building owner
• One bid each for painting and signage, and two bids for the awning
SUPPORTING DOCUMENTS:
1. Aerial – General location
2. Application
3. Façade Photos
4. Estimates
cc: File Copy
August 24, 2025
Project Narrative:
One Percent Better, LLC- Orange Cup SideCar
When we, the owners of Orange Cup Side Car decided to occupy the former
space of the beloved Black Market Bagels at 337 E Main Street in Galesburg,
we hoped to bring a fun, innovative and bright space to downtown. We’ve
wanted to have a presence for some time downtown, so we could participate
in many of the festivities that are limited to downtown businesses, and this
seemed the perfect fit & time.
Our landlord and the building owner, Bob Bondi with Bondi Building Corp, told
us of the Downtown Façade Redevelopment Grant Program, which excited us,
and we began reaching out to Streamline Architects, our architectural design
firm, who helped us design the popular Orange Cup Side Hustle. In
collaborating with them and Bob, we realized we could make a happy, colorful
& tasteful design statement, noticed & appreciated by passersby. We believe
this will help elevate & unify the block, which was preferential to simply
affixing a sign to the east façade of the building.
We propose to use a local painter/artist to do the entire front façade, including
cleaning, power washing, repairing, priming and painting the two metal
façades currently painted green, and also do the center mural work.
For painting, I had trouble finding someone who would do the both the simple
spray painting, but also the multicolor sunburst painting for the center of the
facade. I reached out to Johnson Painting, who we’ve used previously, they
could not fit the project into their scope of painting. Because the job needs lift
rental and artistic/mural artist experience, we submitted the bid we received
from Painting Pros, Doug Alderman, who did similar work at Orange Cup Side
Hustle. We’d want to draw attention to downtown Galesburg when he begins
the project- painting to that scale is newsworthy! We plan to enlist our social
media partners to be actively filming from beginning to end of the exterior and
interior renovations.
In an effort to stay local, for signs, I reached out to Allegra, who does printed
exterior signs-not illuminated, and couldn't provide a bid. The other sign
company, Sign Depot Express, also does printed signs, not the round
illuminated sign the project required. We received a bid & will use Galesburg
Signs to install a circular perpendicular sign, similar to the Jimmy John’s sign
further west on Main. Jeff Pickrell of Galesburg Signs is forwarding the sign
schematic to the committee. See the design schematic provided by
Streamline for the placement. I’m happy to reach out to others outside the
Galesburg area if needed.
By incorporating an awning that spans the length of the building, rather than
only the entryway, it would help with the afternoon sun in each business,
making the businesses look more open & available without blinds or shades
needing to be closed. The existing awning needs replacement, as it has many
seam tears. For awnings, we received two bids, one from Midwest Awnings,
and one from RA Awnings out of Metamora. I also reached out to Canvas
Creations in Galesburg and learned they are no longer in business. RA
Awnings was the bid winner, and they are prepared to begin as soon as they’re
notified.
In closing, we are hopeful to be successful with the Downtown Facade
Redevelopment Grant, as it will allow us to move forward with a project of this
scale. Orange Cup is a local Galesburg homegrown small business. We’re
proud of Galesburg and we give back to Galesburg. It’s what we do.
Thank you for the consideration and we’re available to discuss anytime.
Best regards,
Melany & Scott Baldwin
One Percent Better, LLC- Orange Cup
2701 East Main Street
Galesburg, IL 61401
Douglas Alderman
816 E Knox St
Galesburg, IL 61401 US
+13092996496
alderman1@mac.com
Estimate
ADDRESS
Melany Baldwin
Orange Cup Side Car
Main Street
ESTIMATE #1401
DATE 08/07/2025
EXPIRATION DATE 09/07/2025
ACTIVITY QTY RATE AMOUNT
Labor
Fencing- Peoples will deliver and set up barrier
fencing.
1 150.00 150.00
Labor
Exterior wall- metal facade will be pressure
washed to remove dusting and flaking paint.
Center white panels will be lightly washed to
reduce risk of damage to panels.
1,440 0.50 720.00
Labor
Metal facade- primer coat sprayed and two top
coats sprayed. Color- Orange cup orange.
Sheen - eg-shel (Need additional information of
metal facade to see if primer is required. If not,
price will be reduced.
960 2.50 2,400.00
Labor
Center panels- Orange Cup Sun Burst. White
undercoat- one coat. SW- SuperPaint eg-shel.
Sunburst colors TBD by client.
480 4.50 2,160.00
Material
Power Lift- 55 ft drivable lift. Charged weekly.
1 1,015.00 1,015.00
Labor
Lower stucco around windows and base. Two
coats
1 100.00 100.00
A deposit of 10% of the total (minimum $100) is due upon acceptance
of estimate and to secure a start date. Once a line item or items is
complete a payment is due. If line item payments are not made, work
will stop until payment is satisfied. Final payment (usually referring to
the final line item and any additional fees, costs, upgrades, etc.) is
due on the day of completion of work. Payment can be made in check,
cash or credit card. Credit cards have an additional fee. Payment in
TOTAL $6,545.00
Please sign and return original to us and make a copy for your records. (Email scan is acceptable)
All work to be completed in a professional workmanlike manner according to standard industry practices.
Any unforeseen circumstances, necessary alterations or deviation from above specifications involving
extra cost will require an approved change order before proceeding with the work.
RA Awnings & More will report any unforeseen conditions encountered with the existing fabrics or frames,
building facade, relating masonry and or existing structural connections at the building or at footings prior
to completing the job. Any unforeseen issues with antique or new building facades, structural, masonry or
cosmetic details shall not be the responsibly of RA Awnings and More and will require a written change
order before completing any additional scope of work. (e.g., necessary perforations at lintels or steel
columns or studs unknown at necessary connection points) This includes connections to adjacent
awnings on site. It is assumed that the appropriate internal support capable of withstanding the dead and
live loads put upon them by the awning are existing within the building/home structure.
Existing or proposed connections at window mullions are at risk to owner for any damage to glass
windows on storefronts. Unless stated otherwise, the owner is responsible for all painting and
waterproofing, caulking of residential/commercial building facades, framing interfaces and roofing. Any
scope of work that requires the work of an electrician, roofer or carpenter or mason shall be the
responsibility of the owner. RA Awnings and more shall not be responsible for faulty awning framing that
was not designed or fabricated by RA Awnings and more. This includes any inherited defects (e.g.
corroded steel frames) or existing damages or missing parts discovered during the removal and stripping
process. We offer a one-year guarantee on all craftsmanship and hardware materials and a 10 year
manufactures warranty on Sunbrella fabrics.
By acceptance of this proposal the customer assumes responsibility of interest, collection fees and
attorney fees associated with past due fees/accounts.
Presented By:_ Date:
Sean Rennau
info@raawnings.com
RA Awnings & More, LLC
Thank you for the opportunity and please reach out if there are any questions .
1 of 1
Monday, August 25, 2025 at 10:40:20 Central Daylight TimeMonday, August 25, 2025 at 10:40:20 Central Daylight Time
Subject:Subject:Orange Cup SideCar - Proposal
Date:Date:Monday, August 11, 2025 at 1:25:19 PM Central Daylight Time
From:From:Emily Storm
To:To:Melany Baldwin, Scott Baldwin
CC:CC:Caleb Rogers, Sarah Baldwin
Good Afternoon Melany and Scott,
Streamline proposes a $2,700 fee (20 est. hours) for the facade improvement design work.
Please let us know if you have any questions.
Thanks,