Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Bid Tabulation - Monmouth Blvd Reconstruction
CITY OF GALESBURG STATE OF ILLINOIS TABULATION OF BIDS SECTION : 21-00454-05-RP BIDDER NAME : Gunther Construction, a div. of UCM Illinois Civil Contractors, Inc.Brandt Construction Co. DATE:5/25/2022 Monmouth Blvd- Henderson to Academy BIDDER ADDRESS : 816 N. Henderson Street 420 Pinecrest Drive 700 4th St. W. TIME:11:00 AM CITY/STATE/ZIP : Galesburg, IL 61401 East Peoria, IL 61611 Milan, IL 61264 WITNESS:Tifani Miller, Aaron Gavin BID GUARANTEE : 5% Bid Bond 5% Bid Bond 5% Bid Bond ITEM NO ITEM UNIT QUANTITY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL 1 FURNISHED EXCAVATION CY 632 $103.84 $65,626.88 $67.03 $42,362.96 $75.00 $47,400.00 2 TRENCH BACKFILL CY 10 $128.65 $1,286.50 $137.55 $1,375.50 $220.00 $2,200.00 3 GEOTECHNICAL FABRIC FOR GROUND STAB.SY 1964 $2.54 $4,988.56 $2.02 $3,967.28 $3.00 $5,892.00 4 TOPSOIL, FURNISH AND PLACE, VARIABLE DEPTH SY 261 $43.78 $11,426.58 $22.69 $5,922.09 $35.00 $9,135.00 5 TOPSOIL, FURNISH AND PLACE,4"SY 728 $31.22 $22,728.16 $17.02 $12,390.56 $35.00 $25,480.00 6 NITROGEN FERTILIZER NUTRIENT PD 8 $2.15 $17.20 $13.62 $108.96 $9.00 $72.00 7 PHOSPHERUS FERTILIZER NUTRIENT PD 8 $2.15 $17.20 $13.62 $108.96 $9.00 $72.00 8 POTASSIUM FERTILIZER NUTRIENT PD 8 $2.15 $17.20 $13.62 $108.96 $9.00 $72.00 9 SODDING, SALT TOLERANT SY 658 $37.59 $24,734.22 $17.02 $11,199.16 $43.50 $28,623.00 10 AGGREGATE BASE COURSE, TYPE B, 2"SY 182 $50.68 $9,223.76 $23.32 $4,244.24 $40.50 $7,371.00 11 AGGREGATE BASE COURSE, TYPE B, 6"SY 1984 $25.71 $51,008.64 $30.82 $61,146.88 $19.00 $37,696.00 12 PCC BASE COURSE 6.25"SY 493 $44.79 $22,081.47 $65.42 $32,252.06 $90.00 $44,370.00 13 AGGREGATE SURFACE COURSE, TYPE B TON 11 $251.81 $2,769.91 $61.87 $680.57 $180.00 $1,980.00 14 POLY BITUMINOUS MATERIALS (TACK COAT)POUND 9476 $2.69 $25,490.44 $3.05 $28,901.80 $0.75 $7,107.00 15 TEMPORARY RAMP, DRIVEWAY SY 146 $30.68 $4,479.28 $226.93 $33,131.78 $100.00 $14,600.00 16 POLYMERIZED HMA BINDER COURSE IL-9.5, N50 TON 737 $191.81 $141,363.97 $217.64 $160,400.68 $145.00 $106,865.00 17 POLYMERIZED HMA SURFACE COURSE MIX "D" N50 TON 737 $191.81 $141,363.97 $217.64 $160,400.68 $145.00 $106,865.00 18 PCC DRIVEWAY PAVEMENT, 6"SY 182 $215.50 $39,221.00 $82.10 $14,942.20 $145.00 $26,390.00 19 PCC SIDEWALK, 4"SF 17209 $9.00 $154,881.00 $8.90 $153,160.10 $11.50 $197,903.50 20 PCC SIDEWALK, 6"SF 4150 $13.04 $54,116.00 $13.03 $54,074.50 $14.25 $59,137.50 21 PCC SIDEWALK, 8"SF 226 $31.92 $7,213.92 $14.94 $3,376.44 $25.50 $5,763.00 22 DETECTABLE WARNINGS SF 88 $42.18 $3,711.84 $32.28 $2,840.64 $35.50 $3,124.00 23 PAVEMENT REMOVAL SY 492 $123.77 $60,894.84 $30.41 $14,961.72 $72.00 $35,424.00 24 HMA SURFACE REMOVAL, 3"SY 8293 $6.46 $53,572.78 $7.33 $60,787.69 $7.00 $58,051.00 25 DRIVEWAY PAVEMENT REMOVAL SY 64 $134.82 $8,628.48 $31.81 $2,035.84 $35.00 $2,240.00 26 CCC&G REMOVAL FT 4303 $9.00 $38,727.00 $15.70 $67,557.10 $8.80 $37,866.40 27 SIDEWALK REMOVAL SF 12497 $3.70 $46,238.90 $2.08 $25,993.76 $2.00 $24,994.00 28 STORM SEWER, CLASS B, TY 2, 12"FT 68 $215.57 $14,658.76 $366.19 $24,900.92 $255.00 $17,340.00 29 STORM SEWER REMOVAL,4"FT 11 $220.72 $2,427.92 $152.73 $1,680.03 $60.00 $660.00 30 STORM SEWER REMOVAL, 12"FT 7 $206.52 $1,445.64 $247.90 $1,735.30 $135.00 $945.00 31 INLETS, TYPE A, TY 3 FRAME AND GRATE EA 3 $5,096.62 $15,289.86 $3,576.27 $10,728.81 $3,000.00 $9,000.00 32 INLETS, TYPE B, TY 3 FRAME AND GRATE EA 1 $6,252.24 $6,252.24 $4,471.53 $4,471.53 $3,500.00 $3,500.00 33 MANHOLES TO BE ADJUSTED EA 12 $1,567.31 $18,807.72 $2,344.93 $28,139.16 $1,000.00 $12,000.00 34 INLETS TO BE ADJUSTED EA 1 $1,906.87 $1,906.87 $2,272.29 $2,272.29 $1,900.00 $1,900.00 35 INLETS TO BE ADJUSTED W/ NEW TY 3 FRAME & GRATE EA 6 $1,566.11 $9,396.66 $3,077.37 $18,464.22 $2,000.00 $12,000.00 36 FILLING MANHOLES EA 1 $4,223.65 $4,223.65 $1,616.75 $1,616.75 $1,950.00 $1,950.00 37 REMOVING INLETS EA 3 $963.76 $2,891.28 $496.12 $1,488.36 $1,100.00 $3,300.00 38 CCC&G TYPE B6.18 FT 4298 $30.48 $131,003.04 $54.20 $232,951.60 $30.93 $132,937.14 39 MOBILIZATION LSUM 1 $10,288.83 $10,288.83 $91,282.22 $91,282.22 $85,000.00 $85,000.00 40 PAVEMENT MARKING BLACKOUT TAPE, 4"FT 430 $3.22 $1,384.60 $10.29 $4,424.70 $2.00 $860.00 41 SHORT TERM PAVEMENT MARKING FT 2737 $1.47 $4,023.39 $9.46 $25,892.02 $2.00 $5,474.00 42 SHORT TERM PAVEMENT MARKING REMOVAL SF 322 $8.71 $2,804.62 $15.67 $5,045.74 $7.75 $2,495.50 43 EPOXY PAVEMENT MARKING- LETTERS & SYMBOLS SF 60 $23.63 $1,417.80 $24.96 $1,497.60 $25.00 $1,500.00 44 EPOXY PAVEMENT MARKING LINE 4"FT 1939 $6.93 $13,437.27 $7.32 $14,193.48 $7.25 $14,057.75 45 EPOXY PAVEMENT MARKING LINE 6"FT 255 $10.36 $2,641.80 $10.95 $2,792.25 $11.00 $2,805.00 46 EPOXY PAVEMENT MARKING LINE 12"FT 61 $26.85 $1,637.85 $28.37 $1,730.57 $28.00 $1,708.00 47 DETECTOR LOOP, TY 1 FEET 71 $51.17 $3,633.07 $54.07 3838.97 $41.00 2911.00 48 BRICK SIDEWALK REMOVAL SF 11116 2.97 $33,014.52 2.08 23121.28 1.25 13895.00 49 TEMPORARY RAMP, SPECIAL SY 247 18.14 $4,480.58 56.73 14012.31 50.00 12350.00 50 INLETS, TY G-1 EA 1 9230.93 $9,230.93 4220.03 4220.03 4100.00 4100.00 51 TRAFFIC CONTROL AND PROTECTION, SPECIAL LSUM 1 27983.45 $27,983.45 20140.03 20140.03 32000.00 32000.00 52 HMA DRIVEWAY PAVEMENT, 3"SY 21 332.29 $6,978.09 377.03 7917.63 185.00 3885.00 53 CONSTRUCTION LAYOUT LSUM 1 17720.58 $17,720.58 28366.25 28366.25 20000.00 20000.00 54 AGGREGATE BASE COURSE TYPE B, VAR. DPTH (SPL)SF 21620 2.91 $62,914.20 2.61 56428.20 2.50 54050.00 55 CURB WALL REMOVAL FT 773 11.67 $9,020.91 13.89 10736.97 30.00 23190.00 56 RETAINING WALL REMOVAL FT 125 22.80 $2,850.00 57.12 7140.00 30.00 3750.00 57 CURB WALL TY 1 SF 107 132.96 $14,226.72 105.12 11247.84 145.00 15515.00 58 CURB WALL TY 2 SF 139 102.13 $14,196.07 116.14 16143.46 155.00 21545.00 59 STEP REMOVAL SF 43 55.46 $2,384.78 116.96 5029.28 88.00 3784.00 60 PCC STEPS SF 36 250.61 $9,021.96 87.91 3164.76 475.00 17100.00 61 14 3/4" BOX FOR DETECTOR LOOP EA 1 2380.84 $2,380.84 2515.35 2515.35 700.00 700.00 62 LANDSCAPING (SPL)LSUM 1 710.97 $710.97 11913.82 11913.82 8500.00 8500.00 TOTAL COST 1,462,517.17$ 1,659,676.84$ 1,443,400.79$