Loading...
HomeMy WebLinkAboutBid Tabulation 2022 Intermittent ResurfacingCITY OF GALESBURG Purchasing Operating Under Council- Manager Government Since 1957 2022 INTERMITTENT RESURFACING BIDDER NAME: Section: 22-01003-53-GM BIDDER ADDRESS: Bid Date: 4/20/2022 CITY/STATE/ZIP: ATTENDED BY: MILLER/GAVIN UNIT UNIT UNIT UNIT QTY UNIT ITEM PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL 278.0 SY AGGREGATE SUBGRADE IMPROVEMENT, 10"43.15$ 11,995.70$ 55.00$ 15,290.00$ 255.5 SY 2" AGG BASE CSE, TY B 12.94$ 3,306.17$ 28.00$ 7,154.00$ 328.6 SY 6" AGG BASE CSE, TY B 32.31$ 10,617.07$ 45.00$ 14,787.00$ 16596.2 LBS POLY BIT MATLS TACK COAT 1.86$ 30,868.93$ 1.00$ 16,596.20$ 357.4 SY TEMP RAMP DRIVEWAY 15.04$ 5,375.30$ 40.00$ 14,296.00$ 3061.1 TON PHMA SC MIX D N50 161.80$ 495,285.98$ 148.00$ 453,042.80$ 47.9 SY 6" PCC DRIVEWAY PAVT 113.26$ 5,425.15$ 110.00$ 5,269.00$ 1547.7 SF PCC SIDEWALK 4"12.95$ 20,042.72$ 20.00$ 30,954.00$ 54.6 SF PCC SIDEWALK 6"20.50$ 1,119.30$ 25.00$ 1,365.00$ 697.4 SF PCC SIDEWALK 8"26.97$ 18,808.88$ 30.00$ 20,922.00$ 188.4 SF DETECTABLE WARNINGS 91.69$ 17,274.40$ 38.00$ 7,159.20$ 4227.0 SY HMA SURFACE REM, 1 1/2"6.45$ 27,264.15$ 5.50$ 23,248.50$ 24024.3 SY HMA SURFACE REM, 2"5.82$ 139,821.43$ 7.00$ 168,170.10$ 83.4 SY DRIVEWAY PAVT REM 80.90$ 6,747.06$ 35.00$ 2,919.00$ 1001.8 FT COMB CC&G REM 26.97$ 27,018.55$ 32.00$ 32,057.60$ 2204.0 SF SIDEWALK REM 2.70$ 5,950.80$ 5.50$ 12,122.00$ 1.0 EA WATER VALVE TO BE ADJ 107.87$ 107.87$ 500.00$ 500.00$ 3.0 EA INLET ADJ W NEW TY 3 F&G 1,258.47$ 3,775.41$ 1,800.00$ 5,400.00$ 501.3 FT COMB CC&G TY B6.12 (AEP)91.69$ 45,964.20$ 55.00$ 27,571.50$ 498.5 FT COMB CC&G TY B6.18 (AEP)102.48$ 51,086.28$ 60.00$ 29,910.00$ 1.0 LSUM MOBILIZATION 13,764.68$ 13,764.68$ 60,000.00$ 60,000.00$ 295.8 FT SHORT TERM PVT MARKING 0.69$ 204.10$ 2.00$ 591.60$ 98.6 SF SHORT TERM PVT MARKING REM 16.76$ 1,652.54$ 12.00$ 1,183.20$ 50.0 SF REM & REINSTALL BRICK PVR SW 10.79$ 539.50$ 35.00$ 1,750.00$ 561.9 SY TEMP RAMP SPECIAL 14.35$ 8,063.27$ 30.00$ 16,857.00$ 1.0 LSUM TRAFFIC CONT & PROT SPL 9,060.57$ 9,060.57$ 15,000.00$ 15,000.00$ 35.5 SY 3" HMA DRIVEWAY PAVT 237.24$ 8,422.02$ 117.00$ 4,153.50$ 1.0 LSUM CONSTRUCTION LAYOUT 1,366.16$ 1,366.16$ 2,500.00$ 2,500.00$ TOTAL COST 970,928.19$ 990,769.20$ Gunther Construction Co Brandt Construction Co 816 N Henderson St 700 4th Street West Bid Bond Bid Bond Galesburg, IL 61401 Milan, IL 61264