HomeMy WebLinkAboutBid Tabulation Lead Service Line Replacement 2022Bid: Lead Service Line Replacements Phase VI
Date: 6/22/2022
Attended by: Miller/Rutledge/Gavin
Vendor
City State Zip
Pay Item Unit Est Quantity Unit Price Extension
Customer Side Service EA 500 1,875.00 937,500.00
Customer Side Service, Copper EA 1 2,300.00 2,300.00
Water Service Type 1 EA 180 2,190.00 394,200.00
Water Service Type 2 EA 200 2,300.00 460,000.00
Water Service Type 3 EA 120 3,100.00 372,000.00
Trench Backfill, CLSM EA 120 525.00 63,000.00
Trench Backfill, Sand EA 40 325.00 13,000.00
HMA/PCC Pavement Patch EA 90 1,425.00 128,250.00
PCC Pavement Patch EA 10 785.00 7,850.00
Brick Pavement Patch EA 20 1,495.00 29,900.00
PCC Sidewalk Patch EA 20 575.00 11,500.00
PCC Driveway Patch EA 10 1,650.00 16,500.00
HMA Driveway Patch EA 5 900.00 4,500.00
Aggregate Driveway Patch EA 5 335.00 1,675.00
Seeding EA 500 275.00 137,500.00
Traffic Control & Protection LS 1 25,000.00 25,000.00
Curb Replacement LF 100 95.00 9,500.00
Total Bid:2,614,175.00
Bid Bond
Bids are currently under review by Public Works and Purchasing
J.C. Dillon, Inc
Peoria, IL