Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Bid Tabulation West St Reconstruction
CITY OF GALESBURG Purchasing Operating Under Council- Manager Government Since 1957 WEST ST RECONSTRUCTION BIDDER NAME: Section: 22-00437-10-RP BIDDER ADDRESS: Bid Date: 4/20/2022 CITY/STATE/ZIP: ATTENDED BY: MILLER/GAVIN UNIT UNIT UNIT UNIT UNIT QTY UNIT ITEM PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL 534 CUYD TRENCH BACKFILL 60.85$ 32,493.90$ 58.00$ 30,972.00$ 50.00$ 26,700.00$ 2864 SQYD GEO FAB FOR GRD STAB 1.84$ 5,269.76$ 3.00$ 8,592.00$ 1.75$ 5,012.00$ 299 SQYD AGG BASE CSE, TY B, 2"12.98$ 3,881.02$ 11.00$ 3,289.00$ 15.00$ 4,485.00$ 2864 SQYD AGG BSE CSE, TY B, 6"12.41$ 35,542.24$ 12.00$ 34,368.00$ 13.00$ 37,232.00$ 316 SQYD PCC BASE CRSE, 8"60.10$ 18,991.60$ 100.00$ 31,600.00$ 80.00$ 25,280.00$ 36 POUNDS POLY BIT MATLS (TACK)1.70$ 61.20$ 1.50$ 54.00$ 10.00$ 360.00$ 27 TON POLY HMA BC, IL9.5, N50 418.27$ 11,293.29$ 420.00$ 11,340.00$ 300.00$ 8,100.00$ 27 TON POLY SC, MIX "D", N50 418.27$ 11,293.29$ 420.00$ 11,340.00$ 300.00$ 8,100.00$ 2164 SQYD PCC PVT, 7.5"55.64$ 120,404.96$ 69.00$ 149,316.00$ 75.00$ 162,300.00$ 77 SQYD PCC DWY PVT, 6"67.76$ 5,217.52$ 110.00$ 8,470.00$ 80.00$ 6,160.00$ 222 SQYD PCC DWY PVT, 8"75.95$ 16,860.90$ 101.00$ 22,422.00$ 85.00$ 18,870.00$ 3346 SQFT PCC SW, 4"9.97$ 33,359.62$ 18.00$ 60,228.00$ 11.00$ 36,806.00$ 224 SQFT PCC SW, 6"13.19$ 2,954.56$ 19.00$ 4,256.00$ 14.00$ 3,136.00$ 868 SQFT PCC SW, 8"28.83$ 25,024.44$ 20.00$ 17,360.00$ 24.00$ 20,832.00$ 157 SQFT DETECTABLE WARNING 25.12$ 3,943.84$ 52.00$ 8,164.00$ 35.00$ 5,495.00$ 411 SQYD PAVEMENT REMOVAL 17.80$ 7,315.80$ 14.00$ 5,754.00$ 25.00$ 10,275.00$ 564 SQYD DRIVEWAY PVT REMOVAL 12.84$ 7,241.76$ 14.00$ 7,896.00$ 25.00$ 14,100.00$ 1635 FT CCC&G REMOVAL 5.11$ 8,354.85$ 5.00$ 8,175.00$ 9.00$ 14,715.00$ 4659 SQFT SIDEWALK REMOVAL 2.47$ 11,507.73$ 2.00$ 9,318.00$ 1.75$ 8,153.25$ 380 FT STORM SEWER CL B T1 12"111.20$ 42,256.00$ 106.00$ 40,280.00$ 100.00$ 38,000.00$ 52 FT SS REM, 12"77.63$ 4,036.76$ 74.00$ 3,848.00$ 20.00$ 1,040.00$ 2 EA MH, TY A, 4' DIA., TY 3 F&G 6,104.49$ 12,208.98$ 5,819.00$ 11,638.00$ 5,000.00$ 10,000.00$ 7 EA INLETS, TY A, TY3 F&G 3,477.64$ 24,343.48$ 3,315.00$ 23,205.00$ 2,500.00$ 17,500.00$ 5 EA INLETS, TY B, TY3 F&G 3,604.57$ 18,022.85$ 3,436.00$ 17,180.00$ 3,500.00$ 17,500.00$ 3 EA MH TO BE ADJ 678.24$ 2,034.72$ 1,307.00$ 3,921.00$ 1,000.00$ 3,000.00$ 6 EA INLET REMOVAL 800.43$ 4,802.58$ 763.00$ 4,578.00$ 750.00$ 4,500.00$ 1648 FT CCC&G TB6.18 41.27$ 68,012.96$ 46.00$ 75,808.00$ 35.00$ 57,680.00$ 1 LSUM MOBILIZATION 15,030.87$ 15,030.87$ 19,288.00$ 19,288.00$ 60,000.00$ 60,000.00$ 1840 SQFT BRICK SIDEWALK REMOVAL 2.68$ 4,931.20$ 2.00$ 3,680.00$ 1.75$ 3,220.00$ 1 LSUM TC&P, SPL 5,915.03$ 5,915.03$ 8,706.00$ 8,706.00$ 30,000.00$ 30,000.00$ 100 CUYD TRENCH BACKFILL SPL 127.99$ 12,799.00$ 122.00$ 12,200.00$ 130.00$ 13,000.00$ 1 LSUM CONSTRUCTION LAYOUT 6,818.89$ 6,818.89$ 14,993.00$ 14,993.00$ 5,000.00$ 5,000.00$ 2256 SQYD PVT REM, SPL 31.87$ 71,898.72$ 49.00$ 110,544.00$ 40.00$ 90,240.00$ 4438 SQFT AGG BASE CSE, TY B, 2" (SPL)2.43$ 10,784.34$ 2.00$ 8,876.00$ 2.60$ 11,538.80$ 1759 SQYD TOPSOIL, EXC & PLACE 8.21$ 14,441.39$ 7.00$ 12,313.00$ 5.00$ 8,795.00$ 1 LSUM LANDSCAPING 7,186.06$ 7,186.06$ 5,825.00$ 5,825.00$ 5,000.00$ 5,000.00$ 161 FT CURB WALL REMOVAL 9.46$ 1,523.06$ 6.00$ 966.00$ 25.00$ 4,025.00$ 2 FT 10" DR-18 C-900 PVC PIPE 562.30$ 1,124.60$ 536.00$ 1,072.00$ 250.00$ 500.00$ 820 FT 8" DR-18 C-900 PVC PIPE 84.97$ 69,675.40$ 81.00$ 66,420.00$ 90.00$ 73,800.00$ 15 FT 6" DR-18 C-900 PVC PIPE 80.78$ 1,211.70$ 77.00$ 1,155.00$ 100.00$ 1,500.00$ 20 FT 12" WATER MAIN CASING 174.14$ 3,482.80$ 166.00$ 3,320.00$ 200.00$ 4,000.00$ 1 EA 12"X8" TAP SL & 8" TAP VALVE 5,842.22$ 5,842.22$ 5,569.00$ 5,569.00$ 7,500.00$ 7,500.00$ 1 EA 6" TAP SLEEVE & 6" TAP VALVE 4,573.90$ 4,573.90$ 4,360.00$ 4,360.00$ 5,000.00$ 5,000.00$ 1 EA 10"X8" RJ REDUCER 925.27$ 925.27$ 882.00$ 882.00$ 1,000.00$ 1,000.00$ 2 EA SERVICE LINE REP (LONG SIDE)2,774.77$ 5,549.54$ 2,645.00$ 5,290.00$ 5,000.00$ 10,000.00$ 1 EA SERVICE LINE REP (SHORT SIDE)4,269.68$ 4,269.68$ 4,070.00$ 4,070.00$ 7,500.00$ 7,500.00$ 2 EA FIRE HYD W/ 6" VALVE 6,751.76$ 13,503.52$ 6,436.00$ 12,872.00$ 9,000.00$ 18,000.00$ 3 EA 8X6 RJ TEE 927.37$ 2,782.11$ 884.00$ 2,652.00$ 1,000.00$ 3,000.00$ 2 EA 8" RW GATE VALVE 2,953.11$ 5,906.22$ 2,815.00$ 5,630.00$ 3,500.00$ 7,000.00$ 4 EA 8" RJ 45 DEG FITTING 737.49$ 2,949.96$ 703.00$ 2,812.00$ 1,000.00$ 4,000.00$ 1 EA 6" RJ 90 DEG FITTING 518.24$ 518.24$ 494.00$ 494.00$ 1,000.00$ 1,000.00$ 1 EA 10" ROMAC MACRO COUPLING 1,242.09$ 1,242.09$ 1,184.00$ 1,184.00$ 1,000.00$ 1,000.00$ 3 EA 6" CUT & CAP EX WATER MN 2,059.31$ 6,177.93$ 1,963.00$ 5,889.00$ 1,000.00$ 3,000.00$ 2 EA REM EX. FIRE HYD ASSEMBLY & TEE 372.42$ 744.84$ 355.00$ 710.00$ 1,500.00$ 3,000.00$ 2 EA ABANDON & FILL EX MH 1,194.88$ 2,389.76$ 1,139.00$ 2,278.00$ 1,500.00$ 3,000.00$ TOTAL COST W/O ALT 1 820,928.95$ 937,422.00$ 949,950.05$ 1 LSUM ALT BID#1 PVT REM CREDIT 20,000.00$ 20,000.00$ 50,000.00$ 50,000.00$ 33,000.00$ 33,000.00$ -$ -$ TOTAL COST WITH ALT 1 800,928.95$ 887,422.00$ 916,950.05$ LOW BID DETERMINED BY BASE BID WITHOUT ALT 1 Gunther Construciton Co Laverdiere Construction Brandt Construction Co. 816 N Henderson St 4055 W. Jackson Street 700 4th St. W. Bid Bond Bid Bond Bid Bond Galesburg, IL 61401 Macomb, IL 61455 Milan, IL 61264