Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Bid Tabulation 2023 Misc Sidewalk Projects
CITY OF GALESBURG Purchasing Operating Under Council- Manager Government Since 1957 2023 Misc Sidewalk Replacement BIDDER NAME: Section: 23-01003-61-GM BIDDER ADDRESS: Bid Date: 6/7/2023 CITY/STATE/ZIP: ATTENDED BY: T.MILLER/B.SCHMITT/J.SEITZ UNIT UNIT UNIT UNIT QTY UNIT ITEM PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL 4 SY AGG BASE CSE B 2 115.76$ 463.04$ -$ -$ -$ 3 SY AGG BASE CSE B 6 128.30$ 384.90$ 4 SY PCC DRIVEWAY PAV 6 253.76$ 1,015.04$ 3483 SF PC CONC SIDEWALK 4 10.82$ 37,686.06$ -$ -$ -$ 560 SF PC CONC SIDEWALK 6 14.39$ 8,058.40$ -$ -$ -$ 221 SF PC CONC SIDEWALK 8 45.11$ 9,969.31$ -$ -$ -$ 72 SF DETECTABLE WARNINGS 46.71$ 3,363.12$ 7 SY PAVEMENT REM 317.82$ 2,224.74$ -$ -$ -$ 4 SY DRIVEWAY PAVEMENT REM 365.32$ 1,461.28$ -$ -$ -$ 18 FT COMB CURB GUTTER REM 71.74$ 1,291.32$ -$ -$ -$ 895 SF SIDEWALK REM 3.82$ 3,418.90$ -$ -$ -$ 51 FT PIPE CULVERT REMOV 43.54$ 2,220.54$ -$ -$ -$ 7 FT P CUL CLD 1 6 162.00$ 1,134.00$ -$ -$ -$ 18 FT P CUL CLD 1 8 188.76$ 3,397.68$ -$ -$ -$ 28 FT P CUL CLD 1 10 120.20$ 3,365.60$ -$ -$ -$ 18 FT COMB CC&G TB6.12 AEP 193.33$ 3,479.94$ -$ -$ -$ 1 LSUM MOBILIZATION 10,979.04$ 10,979.04$ -$ -$ -$ 3119 SF BRICK SIDEWALK REMOVAL 3.56$ 11,103.64$ -$ -$ -$ 25 SF REM & REIN BRIC PAVER 38.37$ 959.25$ -$ -$ -$ 1 LSUM TRAF CONT & PROT SPL 3,596.65$ 3,596.65$ -$ -$ -$ 282 SF HMA SIDEWALK REMOVAL 4.54$ 1,280.28$ -$ -$ -$ 4264 SF AGG BASE CSE B 2 (SPL)3.05$ 13,005.20$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ TOTAL COST 123,857.93$ -$ -$ -$ Bid Bond Galesburg, IL 61401 Gunther Construction, div of UCM 816 N Henderson St