Loading...
HomeMy WebLinkAboutBid Tabulation - Water Division Parking LotCITY OF GALESBURG Purchasing Operating Under Council- Manager Government Since 1957 Water Division Parking Lot BIDDER NAME: Section: 24-01502-53-RS BIDDER ADDRESS: Bid Date: 4/5/2024 CITY/STATE/ZIP: ATTENDED BY: Miller/Gavin BID SECURITY: UNIT UNIT QTY UNIT ITEM PRICE TOTAL PRICE TOTAL 43.8 CY EARTH EXCAVATION 78.53$ 3,439.61$ 100.00$ 4,380.00$ 12.8 SY AGGREGATE BASE COURSE, TYPE B 2"9.96$ 127.49$ 120.00$ 1,536.00$ 199.1 SY AGGREGATE BASE COURSE, TYPE B 6"21.81$ 4,342.37$ 35.00$ 6,968.50$ 121.7 SY PORTLAND CEMENT CONCRETE BASE COURSE 7"63.12$ 7,681.70$ 115.00$ 13,995.50$ 4468.9 POUND POLYMERIZED BITUMINOUS MATERIALS (TACK COAT)1.21$ 5,407.37$ 0.50$ 2,234.45$ 59.5 TON POLYMERIZED HOT-MIX ASPHALT BINDER COURSE, IL-9.5, N50 173.84$ 10,343.48$ 200.00$ 11,900.00$ 698.3 TON POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 173.84$ 121,392.47$ 175.00$ 122,202.50$ 34.6 SY PCC DRIVEWAY PAVEMENT 8 152.95$ 5,292.07$ 180.00$ 6,228.00$ 62.8 SF PORTLAND CEMENT CONCRETE SIDEWALK 4 INCH 30.95$ 1,943.66$ 28.00$ 1,758.40$ 52.8 SF PORTLAND CEMENT CONCRETE SIDEWALK 8 INCH 34.01$ 1,795.73$ 43.00$ 2,270.40$ 16.0 SF DETECTABLE WARNINGS 24.55$ 392.80$ 35.00$ 560.00$ 5553.3 SY HOT-MIX ASPHALT SURFACE REMOVAL, 2"6.12$ 33,986.20$ 5.00$ 27,766.50$ 529 SY HOT-MIX ASPHALT SURFACE REMOVAL, 4"6.12$ 3,237.48$ 8.00$ 4,232.00$ 78.3 SY DRIVEWAY PAVEMENT REMOVAL 21.26$ 1,664.66$ 40.00$ 3,132.00$ 152.2 FT COMBINATION CURB AND GUTTER REMOVAL 12.33$ 1,876.63$ 20.00$ 3,044.00$ 128.4 SF SIDEWALK REMOVAL 1.71$ 219.56$ 8.00$ 1,027.20$ 2 EACH VALVE BOXES TO BE ADJUSTED 988.02$ 1,976.04$ 725.00$ 1,450.00$ 151.0 FT COMB CC&G TB6.24 70.65$ 10,668.15$ 95.00$ 14,345.00$ 1.0 L.SUM MOBILIZATION 9,567.48$ 9,567.48$ 17,775.00$ 17,775.00$ 52.6 SY TEMPORARY RAMP, SPECIAL 26.02$ 1,368.65$ 60.00$ 3,156.00$ 226,723.60$ 249,961.45$ Gunther Construction; a div of UCM Brandt Construction Co 816 N Henderson St 700 4th Street West BB BB Galesburg, IL 61401 Milan, IL 61264