Loading...
HomeMy WebLinkAboutBid tabulation - Simmons St & Parking Lot H ReconstructionCITY OF GALESBURG Purchasing Operating Under Council- Manager Government Since 1957 Simmons Street & Parking Lot H Reconstruction BIDDER NAME: Section: 23-01201-59-PK BIDDER ADDRESS: CITY/STATE/ZIP: BID SECURITY: ADDENDUM 1: ADDENDUM 2: ATTENDED BY: A.GAVIN/T.MILLER UNIT UNIT UNIT QTY UNIT ITEM PRICE TOTAL PRICE TOTAL PRICE TOTAL 27 UNIT TREE REMOVAL (6 TO 15 UNITS DIAMETER) 104.98 2,834.46$ 80.00 2,160.00$ 80.00 2,160.00$ 48 UNIT TREE REMOVAL (OVER 15 UNITS DIAMETER) 167.97 8,062.56$ 70.00 3,360.00$ 110.00 5,280.00$ 17 EACH INLET AND PIPE PROTECTION 318.82 5,419.94$ 115.00 1,955.00$ 450.00 7,650.00$ 1969 SQ YD AGGREGATE BASE COURSE, TYPE B 2" 20.93 41,211.17$ 12.00 23,628.00$ 22.00 43,318.00$ 8706 POUND POLYMERIZED BITUMINOUS MATERIALS (TACK COAT) 0.84 7,313.04$ 1.50 13,059.00$ 0.50 4,353.00$ 714 TON HOT-MIX ASPHALT BINDER COURSE, IL-9.5, N50 176.55 126,056.70$ 150.00 107,100.00$ 190.00 135,660.00$ 678 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N50 176.55 119,700.90$ 150.00 101,700.00$ 190.00 128,820.00$ 24 SQ YD PORTLAND CEMENT CONCRETE PAVEMENT 12 INCH 191.48 4,595.52$ 160.00 3,840.00$ 180.00 4,320.00$ 73 SQ YD PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 8 INCH 105.46 7,698.58$ 105.00 7,665.00$ 110.00 8,030.00$ 10411 SQ FT PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH 13.79 143,567.69$ 14.00 145,754.00$ 10.00 104,110.00$ 1075 SQ FT PORTLAND CEMENT CONCRETE SIDEWALK 6 INCH 15.49 16,651.75$ 20.00 21,500.00$ 15.00 16,125.00$ 210 SQ FT DETECTABLE WARNINGS 41.12 8,635.20$ 52.00 10,920.00$ 30.00 6,300.00$ 3014 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 2 1/2" 11.15 33,606.10$ 9.00 27,126.00$ 7.50 22,605.00$ 82 SQ YD DRIVEWAY PAVEMENT REMOVAL 17.83 1,462.06$ 18.00 1,476.00$ 25.00 2,050.00$ 1636 FOOT COMBINATION CURB AND GUTTER REMOVAL 13.25 21,677.00$ 13.00 21,268.00$ 15.00 24,540.00$ 11335 SQ FT SIDEWALK REMOVAL 2.77 31,397.95$ 2.00 22,670.00$ 2.50 28,337.50$ 3 CU YD CONCRETE REMOVAL 855.86 2,567.58$ 800.00 2,400.00$ 650.00 1,950.00$ 328 FOOT STORM SEWERS, CLASS A, TYPE 1 12" 120.73 39,599.44$ 115.00 37,720.00$ 110.00 36,080.00$ 26 FOOT STORM SEWER REMOVAL 10" 15.75 409.50$ 25.00 650.00$ 35.00 910.00$ 97 FOOT STORM SEWER REMOVAL 12" 15.75 1,527.75$ 25.00 2,425.00$ 35.00 3,395.00$ 12 EACH WATER VALVES TO BE ADJUSTED 944.85 11,338.20$ 1,000.00 12,000.00$ 750.00 9,000.00$ 1 EACH FIRE HYDRANTS TO BE RELOCATED 4,724.25 4,724.25$ 7,000.00 7,000.00$ 4,500.00 4,500.00$ 1 EACH MANHOLES, TYPE A, 4'-DIAMETER, TYPE 1 FRAME, OPEN LID 7,477.63 7,477.63$ 6,500.00 6,500.00$ 4,800.00 4,800.00$ 3 EACH MANHOLES, TYPE A, 4'-DIAMETER, TYPE 1 FRAME, CLOSED LID 7,372.64 22,117.92$ 7,000.00 21,000.00$ 5,200.00 15,600.00$ 1 EACH MANHOLES, TYPE A, 5'-DIAMETER, TYPE 1 FRAME, OPEN LID 8,473.90 8,473.90$ 8,000.00 8,000.00$ 4,250.00 4,250.00$ 28 EACH MANHOLES TO BE ADJUSTED 1,742.53 48,790.84$ 2,000.00 56,000.00$ 1,500.00 42,000.00$ 1 EACH REMOVING MANHOLES 1,049.83 1,049.83$ 950.00 950.00$ 800.00 800.00$ 6 EACH REMOVING INLETS 944.85 5,669.10$ 950.00 5,700.00$ 800.00 4,800.00$ 314 FOOT COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.06 74.83 23,496.62$ 55.00 17,270.00$ 70.00 21,980.00$ 720 FOOT COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.12 75.60 54,432.00$ 55.00 39,600.00$ 70.00 50,400.00$ 1022 FOOT COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.18 78.66 80,390.52$ 55.00 56,210.00$ 85.00 86,870.00$ 46 FOOT COMBINATION CONCRETE CURB AND GUTTER, TYPE M-2.06 77.49 3,564.54$ 55.00 2,530.00$ 85.00 3,910.00$ 1 LSUM MOBILIZATION 83,691.01 83,691.01$ - -$ 130,000.00 130,000.00$ 1 SQ FT SIGN PANEL - TYPE 1 2,099.67 2,099.67$ 230.00 230.00$ 525.00 525.00$ 4 EACH REMOVE AND RELOCATE SIGN PANEL ASSEMBLY - TYPE A 419.93 1,679.72$ 175.00 700.00$ 300.00 1,200.00$ 9 FOOT TELESCOPING STEEL SIGN SUPPORT 78.74 708.66$ 45.00 405.00$ 40.00 360.00$ 55 SQ FT MODIFIED URETHANE PAVEMENT MARKING - LETTERS AND SYMBOLS 14.70 808.50$ 20.00 1,100.00$ 15.00 825.00$ 2843 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 4"4.93 14,015.99$ 3.00 8,529.00$ 5.25 14,925.75$ 632 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 6"7.35 4,645.20$ 5.00 3,160.00$ 7.80 4,929.60$ 107 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 8"9.97 1,066.79$ 7.00 749.00$ 10.50 1,123.50$ 118 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 24"15.22 1,795.96$ 19.00 2,242.00$ 16.00 1,888.00$ 45 SQ FT PAVEMENT MARKING REMOVAL - WATER BLASTING 110.76 4,984.20$ 65.00 2,925.00$ 115.00 5,175.00$ 300 FOOT UNDERGROUND CONDUIT, PVC, 1" DIA 31.50 9,450.00$ 29.00 8,700.00$ 53.50 16,050.00$ 3240 FOOT UNDERGROUND CONDUIT, PVC, 1 1/4" DIA 37.79 122,439.60$ 31.00 100,440.00$ 56.00 181,440.00$ 7700 FOOT ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE) 1/C NO. 10 1.84 14,168.00$ 3.00 23,100.00$ 1.95 15,015.00$ 4150 FOOT ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE) 1/C NO. 8 2.52 10,458.00$ 4.00 16,600.00$ 2.65 10,997.50$ 1 EACH LIGHT POLE, ALUMINUM, 30 FT. M.H., 6 FT. MAST ARM 19,421.93 19,421.93$ 12,500.00 12,500.00$ 20,700.00 20,700.00$ 146 FOOT LIGHT POLE FOUNDATION, 24" DIAMETER 289.75 42,303.50$ 465.00 67,890.00$ 310.00 45,260.00$ 750 FOOT ELECTRIC CABLE IN CONDUIT, SIGNAL NO. 14 5C 40.94 30,705.00$ 2.00 1,500.00$ 43.00 32,250.00$ 5 EACH RELOCATE EXISTING SIGNAL HEAD 1,979.99 9,899.95$ 1,100.00 5,500.00$ 2,100.00 10,500.00$ 3 EACH T-GINKGO BIL PS 3 1,049.83 3,149.49$ 1,100.00 3,300.00$ 1,700.00 5,100.00$ 3 EACH T-TAXODI DIS SB 2-1/2 1,049.83 3,149.49$ 1,100.00 3,300.00$ 1,700.00 5,100.00$ 3 EACH T-TILIA AMER MKS 3 1,049.83 3,149.49$ 1,100.00 3,300.00$ 1,800.00 5,400.00$ 2 EACH T-ULMUS ACCOL HE 3 1,049.84 2,099.68$ 1,100.00 2,200.00$ 1,700.00 3,400.00$ 2 EACH T-ZELKOVA SER 2-1/2 1,049.84 2,099.68$ 1,100.00 2,200.00$ 1,700.00 3,400.00$ 15 EACH S-DIER G2X8854 CG 3G 157.48 2,362.20$ 170.00 2,550.00$ 225.00 3,375.00$ 16 EACH S-RHUS AROMA GL 5G 157.48 2,519.68$ 170.00 2,720.00$ 225.00 3,600.00$ 3 EACH S-J CHIN KLLY CMPT 5G 157.48 472.44$ 170.00 510.00$ 335.00 1,005.00$ 3 UNIT PERENNIAL PLANTS, BULB TYPE 629.90 1,889.70$ 700.00 2,100.00$ 1,200.00 3,600.00$ 5.25 UNIT PERENNIAL PLANTS, ORNAMENTAL TYPE, QUART POT 3,569.44 18,739.56$ 3,750.00 19,687.50$ 2,250.00 11,812.50$ 2.7 UNIT PERENNIAL PLANTS, ORNAMENTAL TYPE, GALLON POT 3,779.40 10,204.38$ 4,000.00 10,800.00$ 2,800.00 7,560.00$ 1.54 UNIT PERENNIAL PLANTS, PRAIRIE TYPE, GALLON POT 3,569.44 5,496.94$ 3,750.00 5,775.00$ 2,200.00 3,388.00$ 50 SQ YD LANDSCAPING GRAVEL 31.50 1,575.00$ 35.00 1,750.00$ 115.00 5,750.00$ 5999 SQ YD PULVERIZATION 6.66 39,953.34$ 4.00 23,996.00$ 5.00 29,995.00$ 4 EACH TRASH RECEPTACLES 2,236.25 8,945.00$ 1,850.00 7,400.00$ 2,100.00 8,400.00$ 6 EACH TREE GRATES 3,411.03 20,466.18$ 4,500.00 27,000.00$ 5,800.00 34,800.00$ 1 EACH POWER PEDESTALS 6,823.92 6,823.92$ 2,600.00 2,600.00$ 7,250.00 7,250.00$ 1912 SQ FT STAMPED COLORED PORTLAND CEMENT CONCRETE SIDEWALK, 5 INCH 33.45 63,956.40$ 22.50 43,020.00$ 35.00 66,920.00$ 342 CU YD EARTH EXCAVATION (SPECIAL)48.34 16,532.28$ 33.50 11,457.00$ 30.00 10,260.00$ 342 CU YD TOPSOIL FURNISH AND PLACE (SPECIAL)63.61 21,754.62$ 85.00 29,070.00$ 100.00 34,200.00$ 208 FOOT ORNAMENTAL FENCE 163.26 33,958.08$ 220.00 45,760.00$ 185.00 38,480.00$ 12 EACH INLETS, TYPE G-1 7,312.40 87,748.80$ 3,500.00 42,000.00$ 6,050.00 72,600.00$ 1 EACH FRAMES AND LIDS (SPECIAL)2,169.59 2,169.59$ 2,000.00 2,000.00$ 970.00 970.00$ 1 EACH REMOVE FRAME AND GRATES (SPECIAL)629.90 629.90$ 775.00 775.00$ 275.00 275.00$ 1 LSUM TRAFFIC CONTROL AND PROTECTION, (SPECIAL)17,286.53 17,286.53$ 15,000.00 15,000.00$ 10,000.00 10,000.00$ 2 SQ FT REMOVE AND REINSTALL SIGN PANEL 263.64 527.28$ 150.00 300.00$ 200.00 400.00$ 1 EACH RELOCATE ELECTRIC SERVICE 40,208.64 40,208.64$ 30,000.00 30,000.00$ 43,000.00 43,000.00$ 6 EACH HANDHOLE TO BE ADJUSTED 5,249.17 31,495.02$ 3,500.00 21,000.00$ 5,500.00 33,000.00$ 8 EACH HANDHOLE, COMPOSITE CONCRETE (SPECIAL)2,624.59 20,996.72$ 3,250.00 26,000.00$ 2,800.00 22,400.00$ 10 EACH REMOVE EXISTING LIGHTING SYSTEM 1,764.43 17,644.30$ 3,200.00 32,000.00$ 1,300.00 13,000.00$ 4 FOOT CONCRETE FOUNDATION, TYPE A 12-INCH DIAMETER 157.48 629.92$ 450.00 1,800.00$ 475.00 1,900.00$ 4 EACH BENCHES 1,736.64 6,946.56$ 1,350.00 5,400.00$ 1,800.00 7,200.00$ 3 EACH BICYCLE RACKS 815.08 2,445.24$ 450.00 1,350.00$ 900.00 2,700.00$ 1 EACH CLEANING EXISTING MANHOLE OR HANDHOLE 856.64 856.64$ 1,100.00 1,100.00$ 3,500.00 3,500.00$ 1 L SUM CONSTRUCTION LAYOUT 28,172.93 28,172.93$ 60,000.00 60,000.00$ 40,000.00 40,000.00$ 85 FOOT STORM SEWERS, TYPE 1, WATER MAIN QUALITY PIPE, 12"230.96 19,631.60$ 150.00 12,750.00$ 135.00 11,475.00$ 2 EACH FRAME AND GRATE, SPECIAL 3,292.18 6,584.36$ 2,500.00 5,000.00$ 1,700.00 3,400.00$ 2 EACH REMOVE FRAME AND LID 314.95 629.90$ 800.00 1,600.00$ 400.00 800.00$ 1 L SUM PARKING LOT SIGN REMOVAL AND REINSTALLATION 3,198.80 3,198.80$ 2,500.00 2,500.00$ 6,000.00 6,000.00$ 10 EACH TYPE S1, LIGHTING UNIT COMPLETE 23,596.07 235,960.70$ 26,000.00 260,000.00$ 25,000.00 250,000.00$ 3 EACH TYPE S2, LIGHTING UNIT COMPLETE 32,586.85 97,760.55$ 35,000.00 105,000.00$ 35,000.00 105,000.00$ 8 EACH TYPE S3, LIGHTING UNIT COMPLETE 16,625.17 133,001.36$ 20,000.00 160,000.00$ 17,700.00 141,600.00$ 2 EACH TYPE S4, LIGHTING UNIT COMPLETE 23,890.03 47,780.06$ 22,500.00 45,000.00$ 25,000.00 50,000.00$ 2,341,464.87$ 2,128,476.50$ 2,440,083.35$ AS READ 2,378,476.50$ UNIT UNIT UNIT QTY UNIT ITEM PRICE TOTAL PRICE TOTAL PRICE TOTAL ALTERNATE #1 - PEDESTRIAN CANOPY 100 FOOT UNDERGROUND CONDUIT, PVC, 1 1/4" DIA 41.40 4,140.00$ 32.00 3,200.00 50.00 5,000.00 300 FOOT ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE)1/C NO. 10 2.01 603.00$ 3.00 900.00 2.00 600.00 1 EACH PEDESTRIAN CANOPY 62,140.07 62,140.07$ 53,000.00 53,000.00 55,000.00 55,000.00 2 EACH TYPE A, LIGHTING UNIT COMPLETE 4,847.25 9,694.50$ 8,750.00 17,500.00 4,700.00 9,400.00 76,577.57$ 74,600.00 70,000.00 ALTERNATE #2 - EV CHARGING STATION 140 FOOT UNDERGROUND CONDUIT, PVC, 1 1/4" DIA 41.40 5,796.00$ 32.00 4,480.00 50.00 7,000.00 850 FOOT ELECTRIC CABLE IN CONDUIT, 600V (XLP-TYPE USE)1/C NO. 8 2.76 2,346.00$ 4.00 3,400.00 2.50 2,125.00 1 L SUM EV CHARGING STATION, COMPLETE 27,628.75 27,628.75$ 26,500.00 26,500.00 27,000.00 27,000.00 35,770.75$ 34,380.00 36,125.00 ALTERNATE #3 - DUMPSTER ENCLOSURE 1 EACH DUMPSTER ENCLOSURE 32,740.83 32,740.83$ 40,000.00 40,000.00 30,000.00 30,000.00 32,740.83$ 40,000.00 30,000.00 ALTERNATE #4 - SCREEN PANEL 12 FOOT SCREEN PANEL 1,310.91 15,730.92$ 1,550.00 18,600.00 1,400.00 16,800.00 15,730.92$ 18,600.00 16,800.00 2,502,284.94$ 2,296,056.50$ 2,593,008.35$ Gunther Construction; div of UCM Miller Trucking & Excavating Brandt Construction Co. Milan, IL 61264 816 N Henderson St Galesburg, IL 61401 3303 John Deere Rd 700 4th Street West Bid Date: 8/23/24 Acknowledged Acknowledged Bid Bond Silvis, IL 61282 Acknowledged Acknowledged Acknowledged Bid BondBid Bond Acknowledged ALTERNATE #3 TOTAL ALTERNATE #4 TOTAL BASE BID PLUS ALTERNATE TOTAL BASE BID TOTAL ALTERNATE BID ITEMS ALTERNATE #1 TOTAL ALTERNATE #2 TOTAL