Loading...
HomeMy WebLinkAboutBid tabulation 2024 Intermittent ResurfacingCITY OF GALESBURG Public Works Department Memo Operating Under Council- Manager Government Since 1957 Intermittent Resurfacing for 2024 BIDDER NAME: Project: 24-01003-65-RS BIDDER ADDRESS: Bid Date: 6/5/2024 CITY/STATE/ZIP: Attended by:Miller/Gavin UNIT UNIT QTY UNIT ITEM PRICE TOTAL PRICE TOTAL 57 SY TOPSOIL F & P 6 $45.00 $2,565.00 $51.45 $2,932.65 536 SY AGG BASE CSE B 6 $80.00 $42,880.00 $62.12 $33,296.32 110 SY PCC BASE CSE 8 $110.00 $12,100.00 $115.42 $12,696.20 43604 POUND P BIT MATLS TACK CT $1.00 $43,604.00 $0.77 $33,575.08 3 TON P HMA BC (HM) N50 $500.00 $1,500.00 $638.75 $1,916.25 564 SY TEMP RAMP (DRIVEWAY) $20.00 $11,280.00 $10.59 $5,972.76 6815 TON P HMA SC "D" N50 $140.00 $954,100.00 $145.26 $989,946.90 6841 SF PC CONC SIDEWALK 4 $16.50 $112,876.50 $18.90 $129,294.90 123 SF PC CONC SIDEWALK 6 $22.00 $2,706.00 $20.49 $2,520.27 2251 SF PC CONC SIDEWALK 8 $28.00 $63,028.00 $22.18 $49,927.18 742 SF DETECTABLE WARNINGS $35.00 $25,970.00 $26.63 $19,759.46 110 SY PAVEMENT REM $35.00 $3,850.00 $55.08 $6,058.80 60468 SY HMA SURF REM 2 $4.50 $272,106.00 $5.24 $316,852.32 193 FT CURB REM $28.00 $5,404.00 $10.43 $2,012.99 2505 FT COMB CURB GUTTER REM $28.00 $70,140.00 $39.03 $97,770.15 9297 SF SIDEWALK REM $4.00 $37,188.00 $6.18 $57,455.46 3 FT STORM SEWER REM 6 $225.00 $675.00 $478.44 $1,435.32 6 FT STORM SEWER REM 12 $225.00 $1,350.00 $298.40 $1,790.40 2 EA MAN TA 4 DIA $4,435.00 $8,870.00 $9,267.56 $18,535.12 4 EA INLETS TA T3F&G $3,300.00 $13,200.00 $5,090.42 $20,361.68 1 EA INLETS TB T3F&G $3,500.00 $3,500.00 $6,805.78 $6,805.78 1 EA INLETS, TB $3,600.00 $3,600.00 $6,300.78 $6,300.78 83 EA MAN ADJUST $1,350.00 $112,050.00 $1,957.55 $162,476.65 3 EA INLETS ADJ NEW T3F&G $2,650.00 $7,950.00 $2,117.59 $6,352.77 21 EA VALVE BOX ADJ $1,000.00 $21,000.00 $846.56 $17,777.76 1 EA REMOV MANHOLES $750.00 $750.00 $3,753.62 $3,753.62 4 EA REMOV INLETS $750.00 $3,000.00 $2,238.88 $8,955.52 2454 FT COMB CC&G TB6.12 AEP $65.00 $159,510.00 $67.09 $164,638.86 31 FT COMB CC&G TB6.24 AEP $80.00 $2,480.00 $75.13 $2,329.03 1 L SUM MOBILIZATION $35,000.00 $35,000.00 $39,572.40 $39,572.40 624 FT SHORT TERM PAVT MK $2.75 $1,716.00 $10.81 $6,745.44 209 FT SHORT TERM PAVT MK REM $6.00 $1,254.00 $0.01 $2.09 838 SF THPL PVT MK LTR & SYM $6.00 $5,028.00 $7.35 $6,159.30 13304 FT THPL PVT MK LINE 4 $1.00 $13,304.00 $1.32 $17,561.28 2089 FT THPL PVT MK LINE 6 $1.50 $3,133.50 $1.99 $4,157.11 1663 FT THPL PVT MK LINE 8 $2.00 $3,326.00 $2.66 $4,423.58 692 FT THPL PVT MK LINE 12 $3.00 $2,076.00 $3.99 $2,761.08 834 FT THPL PVT MK LINE 24 $6.00 $5,004.00 $8.40 $7,005.60 6 FT STORM SEW CL B 2 12 $410.00 $2,460.00 $585.72 $3,514.32 1468 SF BRICK SIDEWALK REM $1.65 $2,422.20 $6.18 $9,072.24 129 SF REM & REIN BRIC PAVER $40.00 $5,160.00 $21.04 $2,714.16 10 CY TRENCH BACKFILL SPL $300.00 $3,000.00 $138.99 $1,389.90 1111 SY TEMPORARY RAMP SPL $20.00 $22,220.00 $8.96 $9,954.56 21 FT CONC GUTTER TB SPL $75.00 $1,575.00 $134.70 $2,828.70 1 L SUM TRAF CONT & PROT SPL $16,000.00 $16,000.00 $34,543.43 $34,543.43 1 EA JUNCTION BOX TO BE ADJUSTED $1,350.00 $1,350.00 $0.01 $0.01 1 L SUM RR PROT LIABILITY INS $2,500.00 $2,500.00 $6,110.96 $6,110.96 10408 SF AGG BASE CSE B 2 (SPL) $4.00 $41,632.00 $2.77 $28,830.16 1 EA CASTINGS TO BE REMOVED $475.00 $475.00 $885.20 $885.20 1193 SF PC CONC SIDEWALK, 4" (SPL)$18.00 $21,474.00 $23.18 $27,653.74 TOTAL COST $2,189,342.20 $2,399,386.24 816 N. Henderson St. Galesburg, IL 61401 Gunther ConstructionBrandt Construction 700 4th St. W Milan, IL 61264