Loading...
HomeMy WebLinkAbout26-00000-00-GM Bid TabulationCITY OF GALESBURG Public Works Department Memo Operating Under Council- Manager Government Since 1957 BIDDER NAME: BIDDER ADDRESS: Bid Date: 12/3/2025 CITY/STATE/ZIP: Miller/Gavin/Heisler UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT QTY UNIT ITEM PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL 850 TON Course Aggregate CA-6 (Crushed White Stone) (Delivered)$0.00 $0.00 $0.00 $0.00 $25.00 $21,250.00 $25.00 $21,250.00 $0.00 950 TON HMA Surface Course "D" N50 (Picked Up) $90.00 $85,500.00 $0.00 $0.00 $96.00 $91,200.00 $0.00 $0.00 $75.00 $71,250.00 325 CY CLSM Flowable Mix 2 (Delivered)$0.00 $93.75 $30,468.75 $99.50 $32,337.50 $0.00 $0.00 $0.00 $0.00 25 CY CLSM Flowable Mix 4 (Delivered)$0.00 $93.75 $2,343.75 $97.50 $2,437.50 $0.00 $0.00 $0.00 $0.00 400 CY PCC Class SI (Delivered)$0.00 $157.25 $62,900.00 $174.00 $69,600.00 $0.00 $0.00 $0.00 $0.00 50 CY PCC Class PP1 (Delivered)$0.00 $161.75 $8,087.50 $182.50 $9,125.00 $0.00 $0.00 $0.00 $0.00 50 CY PCC Class PP2 (Delivered)$0.00 $179.75 $8,987.50 $189.50 $9,475.00 $0.00 $0.00 $0.00 $0.00 10 EA Extra Delivery Stops $0.00 $65.00 $650.00 $45.00 $450.00 $0.00 $0.00 $0.00 $0.00 20 GAL Superplasticizer $0.00 $16.00 $320.00 $12.50 $250.00 $0.00 $0.00 $0.00 $0.00 50 EA 1% 1% Non-calcium accelerator $0.00 $8.00 $400.00 $12.00 $600.00 $0.00 $0.00 $0.00 $0.00 6 LOAD Less that 2 cu yd $0.00 $145.00 $870.00 $45.00 $270.00 $0.00 $0.00 $0.00 $0.00 110 CY Hot Water $0.00 $8.00 $880.00 $12.00 $1,320.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Lowest on the road cost is highlighted for items to be picked up Material Quotes for 2026 Bit. Hot Mix, PC Concrete, CA-6, & CLSM Project: 26-00000-00-GM Attended by: Gunther Construction Mill Creek Mining, Inc.River City SupplyRoanoke Concrete Products Galesburg Builders SupplyHoerr's Blacktop & Selacoating, LLC 700 4th St W Milan, IL 61264 Tickle Asphalt Co. Ltd 3715 N Trivoli Rd Trivoli, IL 61569 1275 Spring Bay Rd East Peoria, IL 61611 816 N. Henderson St. Galesburg , IL 61401 816 N. Henderson St. Galesburg, IL 61401 816 N. Henderson St. Galesburg, IL 61401 700 4th St. W Milan, IL 61264 Tazewell County Asphalt 23497 Ridge Rd East Peoria, IL 61611 LATE SUBMISSION CITY OF GALESBURG MFT Material Quotes for 2026 Bit. Hot Mix Project: 26-00000-00-GM Bid Date: 12/3/2025 Company Bid price Location Miles Time (Hrs.) Round Trip Truck Cost Labor Cost Materal Cost (9 tons/truck)Total Cost Cost/ton Rank Hot Mix Asphalt Hoerr's Blacktop & Sealcoating $90.00 Trivoli, IL 37 1.48 $111.93 $49.98 $810.00 $971.91 $107.99 3 River City Supply $96.00 Galesburg, IL 2 0.08 $6.05 $2.70 $864.00 $872.75 $96.97 2 Tickle Asphalt $75.00 Milan, IL 42 1.68 $127.06 $56.73 $675.00 $858.79 $95.42 1 GVW Hrly. Rate Hrly Truck Rate 17690 $75.63 Hrly Labor Rate $33.77 Calculation of hrly truck rate: In 1 hr. the truck can drive 50 miles. The truck gets 4 miles to the gallon In 1 hr. the truck uses 12.5 gallons of fuel 1 gallon fuel is $3.93 x 12.5 gallons = $49.13/hr for just fuel Plus wear and tear on the truck which includes tires, oil, misc. repairs, $26.50/hr. Lowest on the Road Cost