Loading...
HomeMy WebLinkAboutBid Tabulation 2025 Intermittent ResurfacingCITY OF GALESBURG Purchasing Operating Under Council- Manager Government Since 1957 2025 Intermittent Resurfacing BIDDER NAME: BIDDER ADDRESS: 06/25/2025 CITY/STATE/ZIP: ATTENDED BY: T.MILLER/A.GAVIN/M.KIRGAN UNIT UNIT QTY UNIT ITEM PRICE TOTAL PRICE TOTAL 5 SQ YD TOPSOIL FURNISH AND PLACE, 6"135.94$ 679.70$ 105.00$ 525.00$ 134 SQ YD AGGREGATE BASE COURSE TYPE B, 6"33.32$ 4,464.88$ 120.00$ 16,080.00$ 14266 POUND POLY BITUMIOUS MATERIALS (TACK COAT)1.23$ 17,547.18$ 1.00$ 14,266.00$ 431 SQ YD TEMPORARY RAMP 8.98$ 3,870.38$ 10.00$ 4,310.00$ 2229 TON POLYMERIZED HOT MIX ASPHALT SURFACE COURSE, MIX D N50 144.19$ 321,399.51$ 145.00$ 323,205.00$ 20 SQ YD PORTLAND CEMENT CONCRETE PAVEMENT 7.5"122.60$ 2,452.00$ 285.00$ 5,700.00$ 20 SQ YD PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT 6"200.82$ 4,016.40$ 155.00$ 3,100.00$ 2753 SQ FT PORTLAND CEMENT CONCRETE SIDEWALK 4"16.80$ 46,250.40$ 19.00$ 52,307.00$ 1455 SQ FT PORTLAND CEMENT CONCRETE SIDEWALK 8"18.82$ 27,383.10$ 30.00$ 43,650.00$ 388 SQ FT DETECTABLE WARNINGS 37.20$ 14,433.60$ 40.00$ 15,520.00$ 20 SQ YD PAVEMENT REMOVAL 93.75$ 1,875.00$ 115.00$ 2,300.00$ 19814 SQ YD HOT MIX ASPHALT SURFACE REMOVAL 2"5.31$ 105,212.34$ 5.50$ 108,977.00$ 20 SQ YD DRIVEWAY PAVEMENT REMOVAL 69.83$ 1,396.60$ 70.00$ 1,400.00$ 498 FEET COMBINATION CURB AND GUTTER REMOVAL 19.66$ 9,790.68$ 50.00$ 24,900.00$ 3305 SQ FT SIDEWALK REMOVAL 3.63$ 11,997.15$ 5.00$ 16,525.00$ 1 EACH MANHOLES, TYPE A, 4' DIAMETER 8,157.43$ 8,157.43$ 4,885.00$ 4,885.00$ 3 EACH INLETS, TYPE A 4,465.38$ 13,396.14$ 3,650.00$ 10,950.00$ 1 EACH INLETS, TYPE B, TYPE 3 FRAME AND GRATE 5,844.17$ 5,844.17$ 3,550.00$ 3,550.00$ 1 EACH INLETS, TYPE B 5,261.30$ 5,261.30$ 3,350.00$ 3,350.00$ 18 EACH MANHOLES TO BE ADJUSTED 1,909.73$ 34,375.14$ 1,600.00$ 28,800.00$ 4 EACH INLETS TO BE ADJUSTED WITH NEW TYPE 3 FRAME AND GRATE 2,592.30$ 10,369.20$ 2,750.00$ 11,000.00$ 3 EACH VALVE BOXES TO BE ADJUSTED 891.08$ 2,673.24$ 1,200.00$ 3,600.00$ 1 EACH REMOVING MANHOLES 1,854.43$ 1,854.43$ 1,600.00$ 1,600.00$ 5 EACH REMOVING INLETS 1,262.01$ 6,310.05$ 1,600.00$ 8,000.00$ 451 FEET COMBINATION CONCRETE CURB AND GUTTER, TYPE B - 6.12 (AEP)105.75$ 47,640.38$ 85.00$ 38,292.50$ 69 FEET COMBINATION CONCRETE CURB AND GUTTER, TYPE B - 6.18 (AEP)112.71$ 7,720.64$ 95.00$ 6,507.50$ 1 L. SUM MOBILIZATION 19,422.72$ 19,422.72$ 25,000.00$ 25,000.00$ 4 FEET STORM SEWER PIPE CLASS B, TYPE 2, 10"383.25$ 1,533.00$ 645.00$ 2,580.00$ 2 FEET STORM SEWER PIPE CLASS B, TYPE 2, 12"766.51$ 1,533.02$ 965.00$ 1,930.00$ 515 SQ FT REMOVE AND REINSTALL BRICK PAVER 23.85$ 12,282.75$ 45.00$ 23,175.00$ 1 CU YD TRENCH BACKFILL SPECIAL 154.57$ 154.57$ 1,265.00$ 1,265.00$ 211 SQ YD TEMPORARY RAMP SPECIAL 9.17$ 1,934.87$ 10.00$ 2,110.00$ 520 SQ FT BRICK SIDEWALK REMOVAL 3.63$ 1,887.60$ 5.00$ 2,600.00$ 6 FEET STORM SEWER REMOVAL 353.71$ 2,122.26$ 400.00$ 2,400.00$ 1 L. SUM TRAFFIC CONTROL AND PROTECTION SPECIAL 15,999.79$ 15,999.79$ 13,200.00$ 13,200.00$ 1 L. SUM RAILROAD PROTECTIVE LIABILITY INSURANCE 6,605.11$ 6,605.11$ 6,000.00$ 6,000.00$ 4208 SQ FT AGGREGATE BASE COURSE TYPE B, 2" SPECIAL 2.34$ 9,846.72$ 6.50$ 27,352.00$ TOTAL COST 789,693.45$ 860,912.00$ Gunther Construction, div of UCM 816 N Henderson St Brandt Construction Co. 700 4th Street WestSection: 25-01003-69-RS Bid Date: Bid Bond Galesburg, IL 61401 Milan, IL 61264 Bid Bond